cs.AINov 12, 2026

Speed-to-Power Dominates Energy Costs for AI Data Centers: Technoeconomic Analysis of Powering AI in the Continental United States

Authors: Alex C. Newkirk, Daniel L. Gerber, Erica R. H. Fuchs, Alex Hubbard, M. Granger Morgan, Arman Shehabi, Sarah J. Smith, Constantine Samaras

Organizations: Department of Engineering and Public Policy, Carnegie Mellon University, Pittsburgh, PA · University of California, Berkeley, Berkeley, CA · Department of Civil and Environmental Engineering, Carnegie Mellon University, Pittsburgh, PA · Wilton E. Scott Institute for Energy Innovation, Carnegie Mellon University, Pittsburgh, PA

Abstract

The rapid growth of artificial intelligence is driving demand for new data centers at large scale and on short deployment timelines. To power them, firms connect to the commercial grid or contract generation directly, but interconnection and gas-turbine delays now incentivize on-site generation. We compare grid-connected and off-grid data center energy infrastructure (AC- and DC-coupled solar-plus-storage, islanded natural gas, and grid interconnection) across the continental U.S. Using an open-source technoeconomic framework built on empirically calibrated AI training loads, climate-driven cooling, stage-by-stage power conversion, and physics-based battery degradation, we model designs providing equivalent energy services. Our central contribution is a speed-adjusted cost of energy that values the compute unlocked by faster construction, making options with different deployment timelines directly comparable on one physically consistent basis. We find DC coupling reduces lifetime energy costs by 18% ($0.09/ kWh) on average versus AC counterparts by eliminating inverters and improving efficiency. Though rarely cheapest on unadjusted energy cost, DC-coupled microgrids' faster deployment makes them the lowest-cost modeled option in 85% of U.S. locations once foregone compute is valued, or 55% under accelerated natural gas timelines. For AI infrastructure, deployment speed rather than unit energy cost determines the economically preferred path to power.

Figures & tables

Explore similar work

Sep 8, 2026

AI for AI: Optimizing Additional Infrastructure Build-out to Power Artificial Intelligence Data Centers

The twenty-first century's transformative technology, artificial intelligence, is increasingly constrained by the twentieth century's transformative technology, the electricity grid. Rapid growth in electricity demand from data centers is leading to higher electricity prices, without a compensating supply-side response. We develop a framework linking data-center load growth, available generation capacity, and market-clearing prices to understand this phenomenon. We first analyze a deterministic model to show how differing estimates of demand and supply growth rates affect prices. We then model the expansion of new data centers and their associated electricity demand, together with build-outs of new electricity supply, as stochastic processes,resulting in probabilistic distributions of supply, demand, and prices rather than a single forecast. Finally, we formulate generation expansion as a stochastic control problem in which a revenue-maximizing investor dynamically chooses the intensity of supply-side investments. The analysis highlights a central challenge of the data-center build-out: even when rapid demand growth increases the need for new generation, the uncertainties related to load forecasts, development execution risks, and value cannibalization from overbuilding capacity may weaken incentives to invest at the pace required to keep electricity prices stable.
Jun 23, 2026

Power-Flexible AI Data Centers: A New Paradigm for Grid-Responsive Compute

The rapid expansion of artificial intelligence (AI) infrastructure is driving unprecedented growth in electricity demand from data centers. Traditional power-system planning treats large computing facilities as inflexible peak loads, leading to costly infrastructure upgrades and long delays in grid interconnection. Recent work has shown that AI clusters can reduce electricity consumption during peak demand through software-based workload orchestration. This article explores how modern GPU-based AI data centers can operate as grid-interactive assets that respond dynamically to power system conditions. We describe an architecture integrating grid signals, workload scheduling, and power telemetry for fine-grained cluster power control. Experimental results from a real-world deployment on a 130 kW GPU cluster demonstrate multiple forms of flexibility, including rapid load reduction, sustained curtailment, and carbon-aware operation while preserving service levels for priority jobs. We further demonstrate performance-aware load shifting across geographically distributed clusters, enabling workloads to migrate toward regions with lower grid stress. Together, these capabilities transform AI infrastructure from static electricity consumers into flexible resources that support grid reliability, accelerate interconnection, and improve computing sustainability.
May 30, 2026

Certificates without Electrons? Theory and Evidence on Impacts from AI-Driven Power Demand

Data centers now account for 4.4% of United States electricity demand, yet the grid-level effectiveness of the renewable energy certificates (RECs) and power purchase agreements (PPAs) hyperscalers use to claim carbon neutrality remains unclear. We develop a game-theoretic model in which a data center operator chooses among RECs, PPAs, and behind-the-meter colocation while generators make entry decisions under endogenous financing costs. The model identifies a timing wedge -- the mismatch between consumption and credited renewable generation -- as a central mechanism through which AI demand degrades reliability, raises prices, and increases emissions even when RECs cover 100% of annual consumption. Colocation with storage addresses this wedge directly and induces the greatest renewable entry by eliminating generator revenue risk. We test these predictions by exploiting the staggered release of large language models as a natural experiment, using difference-in-differences on a novel dataset linking AI activity to local grid outcomes. AI demand significantly increases fossil generation, wholesale prices (up to 25% in treated PJM zones), and outage frequency (0.5--1 additional outages per year) near data centers, with impacts scaling in model size. Data centers with on-site generation exhibit a sign reversal in power-quality effects, consistent with the model's prediction that behind-the-meter capacity absorbs demand spikes. Counterfactual analyses show that edge inference, spatial reallocation, and colocated storage each substantially mitigate grid impacts, while REC-only strategies do not. Together, our results demonstrate that the externalities of AI to the grid are tightly coupled to procurement design and the spatial organization of data center infrastructure.