cs.LGJul 29, 2026

PowerAtlas: Towards Electricity-Computing Co-Scheduling for Power Systems

Authors: Kaiwen Jiang, Siya Xu, Ziyue Zhu, Chao Yang, Anh Tuan Luu, Haoran Luo

Abstract

The rapid growth of AI workloads is turning data centers into large-scale, volatile, yet spatiotemporally flexible grid loads, creating an urgent need for coordinated electricity-computing scheduling. Under stringent grid constraints, schedules from general-purpose large language models (LLMs) are often infeasible, causing line-flow violations and unserved load. We present PowerAtlas, an LLM-agent framework for electricity-computing co-scheduling that integrates historical instances, domain knowledge, and physical constraints to produce joint decisions satisfying both grid operational rules and the service-level agreements (SLAs) of computing tasks. Working with a provincial power utility in China, we built an experimental electricity-computing network and validated the decision loop on real data-center data; from de-identified operational data we further constructed ECBench, a benchmark of 2,000 scheduling instances with oracle-optimal solutions. Experiments across eleven LLMs demonstrate the effectiveness of PowerAtlas under realistic physical operating conditions, with consistent feasibility and cost gains across three open-weight backbones. Our code is publicly available at https://github.com/JAVA-Jiang/PowerAtlas.

Explore similar work

Jun 23, 2026cs.DC

Power-Flexible AI Data Centers: A New Paradigm for Grid-Responsive Compute

The rapid expansion of artificial intelligence (AI) infrastructure is driving unprecedented growth in electricity demand from data centers. Traditional power-system planning treats large computing facilities as inflexible peak loads, leading to costly infrastructure upgrades and long delays in grid interconnection. Recent work has shown that AI clusters can reduce electricity consumption during peak demand through software-based workload orchestration. This article explores how modern GPU-based AI data centers can operate as grid-interactive assets that respond dynamically to power system conditions. We describe an architecture integrating grid signals, workload scheduling, and power telemetry for fine-grained cluster power control. Experimental results from a real-world deployment on a 130 kW GPU cluster demonstrate multiple forms of flexibility, including rapid load reduction, sustained curtailment, and carbon-aware operation while preserving service levels for priority jobs. We further demonstrate performance-aware load shifting across geographically distributed clusters, enabling workloads to migrate toward regions with lower grid stress. Together, these capabilities transform AI infrastructure from static electricity consumers into flexible resources that support grid reliability, accelerate interconnection, and improve computing sustainability.
Chris Williams, Philip Colangelo, Ayse Coskun +15
May 4, 2026cs.DC

From Barrier to Bridge: The Case for AI Data Center/Power Grid Co-Design

For over a century, the electric grid has relied on a single statistical assumption: \emph{load diversity}, the principle that the uncorrelated demands of millions of small consumers produce a smooth, predictable aggregate. AI training data centers break that assumption. A single hyperscale training campus can draw power comparable to a mid-sized city, driven by one tightly synchronized job whose demand swings by hundreds of megawatts in seconds. This paper argues that the resulting entanglement of compute and power infrastructure requires a shift from implicit coexistence to explicit co-development between the historically decoupled data center and electric power industries. We introduce the distinct design principles, operational philosophies, and economic incentives of each sector, and show why their cultural and technical misalignment makes coordination difficult. We identify key research directions, from joint capacity planning, multi-timescale control, a compute--power protocol stack, to market innovation, that must be pursued to power the future of AI sustainably and reliably.
Noman Bashir, Rob Sherwood, Le Xie +1
May 6, 2026cs.LG

OpenG2G: A Simulation Platform for AI Datacenter-Grid Runtime Coordination

AI's growing compute demand and new datacenter buildouts present major capacity and reliability challenges for the electricity grid, leading to multi-year interconnection delays for new datacenters and bottlenecking AI growth. To ease this strain, datacenters increasingly offer rapid power flexibility in response to grid signals, where the datacenter can increase or decrease its power consumption by adapting its workload in real time. In order to understand the impact of large datacenters on the grid and to facilitate the design of effective coordination strategies, we build OpenG2G, a simulation platform for AI datacenter-grid runtime coordination. We show that OpenG2G is capable of answering a wide range of coordination questions by allowing users to implement and compare various control paradigms (including classic, optimization, and learning-based controllers), and quantify how AI model and deployment choices affect datacenter flexibility and coordination outcomes. This versatility is enabled by OpenG2G's modular and extensible architecture: a datacenter backend driven by real measurements of production-grade AI services, a grid backend built on high-fidelity grid simulators, and a generic controller interface that closes the loop between them. We describe the design of OpenG2G and demonstrate its usefulness through realistic grid scenarios and AI workloads.
Jae-Won Chung, Zhirui Liang, Yanyong Mao +3