cs.AIAug 17, 2026

A Shop Floor Production Scheduling Case based on RFID-supported Smart Factory

Authors: Zhihui Chen, Yize Sun, Yuhao Dong, Zeyu Xiao, Ray Y. Zhong

Organizations: Department of Mathematics The University of Hong Kong Hong Kong, China · Department of Industrial and Manufacturing Systems Engineering The University of Hong Kong Hong Kong, China

Abstract

Radio frequency identification (RFID) technology has been widely implemented for real-time data collection in manufacturing shop floors, which, in turn, can be used to support dynamic shop floor production planning and scheduling. Within such an environment, uncertainty in operation and production processes collectively contribute to the dynamicity in manufacturing, thereby hampering the scheduling system from achieving maximal utility. To highlight the importance of handling such uncertainty, this paper addresses the problem of dynamic shop floor scheduling for a real-life case smart factory equipped with RFID technology. Feasible production sequence mining and real-time processing rate estimation are conducted on RFID-collected production data to quantify the operation and production uncertainties. A deep reinforcement learning approach based on the RFID data analysis is then presented for shop floor production scheduling. Simulation studies based on real-life case data have demonstrated the feasibility and practicality of the proposed dynamic production scheduling framework. Specifically, it is observed that the proposed framework outperforms existing dispatch methods in terms of minimizing operation makespan, including first in first out (FIFO), last in first out (LIFO) and deep Q network (DQN).

Figures & tables

Explore similar work

CardsList
  1. A Sliding-Window-Based Reinforcement Learning for Dynamic Assembly Flow Shop Scheduling with Multi-Product Delivery

    Jul 3, 2026Junhao Qiu, Jianjun Liu, Ting Liu +3Combinatorial OptimizationRL for Combinatorial Optimization

  2. Reinforcement Learning-Based Production Scheduling in an Industry-Based Coating Scenario Using the Digital Model Playground

    Aug 14, 2026Arne Kröger, Ralf Buschermöhle, Wilhelm Hasselbring +1ManufacturingRL for Combinatorial Optimization

  3. Learning Flexible Job Shop Scheduling under Limited Buffers and Material Kitting Constraints

    Feb 27, 2026Shishun Zhang, Juzhan Xu, Yidan Fan +4Flexible Job Shop SchedulingJob Shop Scheduling