cs.AISep 2, 2026

ERRAND: Budgeted Maintenance of Agent Memory

Authors: Beining Wu, Zihao Ding, Jun Huang

Organizations: Department of Electrical Engineering and Computer Science South Dakota State University, Brookings, SD 57007, USA

Abstract

Deployed agents run on handed-over knowledge: a frozen policy consults a briefing of consolidated items written before the stream begins. The world then moves while the store stands still: paths close, flags change, price bands move; every item was true at handover, and the failure is staleness, not ignorance. We introduce ERRAND, which treats revalidation as a priced errand: a recheck competes with the task it protects for the same scarce actions, funded only when the value per action of resolving a doubt clears a running wage. The errand index is single-peaked, vanishing at both ends of belief, so certainty in either direction costs nothing; free en-route receipts maintain on-path knowledge, and repair writes a version, never a deletion. Under equal action budgets in two drifting tool-use worlds, ERRAND clears every non-oracle policy on the preregistered calibers, primary in every setting and conditional at every binding budget, leading eager revalidation by 10.0pp at the base cap. Restraint wins: given no cap, ERRAND stops on its own, spending 11.0% of steps, while uncapped eager revalidation spends 70.7% and still finishes 4.5pp behind capped ERRAND. The margin sits where the briefing's coverage is thinnest, the shadow price of long-tail knowledge: a small budget, well priced, beats a bigger store that never rechecks.

Figures & tables

Appendix figures & tables26 assets

Supplementary material from the paper’s appendix.

Appendix

Explore similar work

Aug 26, 2026cs.IR

When Stale Constraints Go Unchecked: Budgeted Verification Failures in Inherited Agent Memory

Provenance links keep the evidence behind an inherited belief reachable; an agent with a verification budget must still choose which links to inspect. We study a consolidated memory that states a decision constraint and whose source record has since been superseded by a record that withdraws it: provenance is immutable, the current record has changed, and the memory is stale. In a controlled six-memory scenario with a budget of two records, sixteen language models rarely re-verified a constraint that read as settled: they inspected its provenance path in about one episode in five and, once the constraint had been superseded, produced stale-consistent decisions in 77.3%, 74.7% and 74.7% of episodes across a primary run, a replication and a held-out domain. Re-assigning one of the same two slots to the critical path removed most of them: +74.0, +72.7 and +61.3 points (positive in every model), +80.7 in a prospectively frozen interleaved replication with a repaired non-critical control, and +62.0 on a panel of 10 models from 9 organisations; a corrected re-run of the held-out scenario gave +73.3. The forced-critical policy uses experimenter knowledge of the critical path: it quantifies how much stale-decision risk the same budget can recover and is not a scheduler. Two further deposited experiments locate the failure and a remedy: in this store the constraint's path is selected in 17.0% of episodes at two slots and 88.7% at four of six (above uniform allocation), and at two slots a one-sentence, target-blind rule (prefer memories that state a limit on a candidate direction) moved the agent's own allocation onto the constraint's path and recovered the oracle contrast on decisions (+89.3 points) where that constraint limits the tempting action, while a content-free freshness cue did not materially redirect allocation and a content-matched control rule changed neither selection nor decisions.
Oct 2, 2026cs.CL

When Evidence Changes: Evaluating Memory Repair and Re-reading in Language-Model Agents

When documents supporting an agent's derived facts are revoked or replaced, should it repair memory or re-read current evidence? We introduce an evidence-revision evaluation on medication- and problem-list tasks from public ICU records. Under revocation, replacement and control events, we compare full and source-filtered re-reading with caching, rebuilding and graph-local repair across two 7B models. Memory is supplied in full without retrieval, and costs include ingest, revision and every use. On short records, local repair uses 5-10×\times fewer revision tokens than rebuilding, yet every memory pipeline costs at least twice full re-reading in held-out conditions. In a small pre-specified development sweep, adding task-ineligible documents extended records to about 10,000 tokens; at that length, memory's mean cumulative cost fell below full re-reading's after 2-14 uses, partly through truncated extraction, while source-filtered re-reading remained cheapest. In the replacement study, none of the four primary confirmatory tests reached statistical significance. These results show why the cost of agent memory after evidence revision must be assessed against source-filtered re-reading over the full pipeline.
Sep 29, 2026cs.AI

When Should Agents Check External State? Budgeting Observations for Stored Intentions

Prospective memory allows an agent to retain an intention tied to a future condition, but the stored intention does not reveal whether that condition currently holds. Checking it may require web access, multi-step tool use, and paid calls. Existing systems decide when intentions require attention, but do not allocate the resulting observations under a shared budget. We introduce the first resource-allocation formulation for the external observations required by stored intentions under a shared episode budget. BudgetPM offers two policy variants that share a hard-budget executor. BudgetPM-Static uses a lightweight Logistic scorer to learn whether a check improves the current decision. BudgetPM-Sequential distills full-episode hindsight schedules into a lightweight policy that decides when to spend or reserve capacity using only pre-query information at deployment. We evaluate BudgetPM against two public memory-agent systems, five matched controls, and four hand-designed monitoring or budget-adaptation rules. Across two benchmarks and three backbones, BudgetPM-Static outperforms adapted Mem0 and PMA workflows. On PM-Bench, its Logistic scorer reaches competitive quality--cost operating points alongside higher-capacity scorers and retains 99.9--100% of unconstrained quality with 42--54% fewer observations. Under severe scarcity and the same hard caps, BudgetPM-Sequential exceeds the strongest tested natural monitoring schedule by 1.92--2.58 Set F1 points. It reaches the same Set F1 and on-time recall with 16--33% fewer observations. Matched attribution, exact-cost analysis, and a fixed-budget load intervention link this gain to competition between present and future opportunities. These results yield a demand--capacity design rule: local gating works when capacity covers demand, while future-aware supervision adds value when observations compete across time.