BOLT: Multi-Bottleneck Bound-Guided Learning for Flexible Job-Shop Scheduling with Time Lags and Resource-Coupled Transport

Authors: Ziheng Zhang, Wei Zhang, Yunyi Zhao, Zuming Liu, Wei Zhou, Boon Ping Gan

Organizations: Infocomm Technology Cluster, Singapore Institute of Technology, Singapore 828608 · College of Smart Energy, Shanghai Jiao Tong University, Shanghai, China · School of Computer Science and Informatics, Cardiff University, Cardiff CF24 4AG, U.K. · D-SIMLAB Technologies, Singapore

Abstract

Flexible job-shop scheduling becomes resource-coupled when a scarce vehicle fleet moves jobs between stations, because the schedule sets the transport waits. BOLT (bound-oriented learning for transport-coupled scheduling) builds a lower bound from chain, machine-capacity, and fleet-capacity relaxations. The bound equals the makespan at termination, so its per-step changes form a reward that sums to a constant minus the makespan. Because it never exceeds the attainable makespan, each candidate's bound increase is a proven rise of the makespan floor, which the policy reads as a price. The root bound certifies a completed schedule's suboptimality gap without a solver. On industry-motivated 10-module prefabricated-construction instances, explicit transport coupling outperforms a transport-penalty policy in every tested cell where loaded moves occupy at least 66% of fleet time and in none at or below 56%. Across five zero-shot 50- and 80-module production batches, BOLT outperforms the best dispatching-rule pair on four and the penalty policy on the three with long moves. In the three-vehicle 80-module batch, its mean makespan is 13.0% below the best pair and 4.2% below an hour-budget constraint-programming solver whose proven gap averages 34%. BOLT decides in 2.3-5.9 ms per event on one processor core and re-plans a disruption in seconds.

Figures & tables

Explore similar work

CardsList
  1. An Analysis of the Coordination Gap between Joint and Modular Learning for Job Shop Scheduling with Transportation Resources

    Apr 27, 2026Moritz Link, Jonathan Hoss, Noah KlarmannMulti-Agent CoordinationCombinatorial Optimization

  2. CoRS: Fast Neural Flexible Job-Shop Scheduling via Composite Interval State Reuse

    Oct 19, 2026Jiang Sutong, Zhao Peng, Wu Xuan +6Flexible Job Shop SchedulingNeural Combinatorial Optimization