Organizations: Graduate School of Information Science and Technology, The University of Osaka, Suita, Osaka 565-0871, Japan · LAMIH UMR CNRS 8201 Laboratory, Université Polytechnique Hauts-de-France, and INSA Hauts-de-France, Valenciennes 59313, France · School of Transportation Science and Engineering, Beihang University, Beijing 100191, China · RIKEN Center for Advanced Intelligence Project, Tokyo 103-0027, Japan
Lifelong multi-agent path finding replans routes for automated guided vehicles, but deviations can invalidate a plan. With one-way lanes, a late vehicle or lost planner can close a ring of full segments. We separate how fast the floor runs from whether it keeps running. In OpenRing a planner proposes routes and an order, a local guard commits only moves and route changes that cannot close such a ring, and the order binds for a bounded time. Despite arbitrary proposals or planner loss, no ring closes. With two-place segments, traffic can continue under disturbances; progress is guaranteed once they end, and all vehicles exit if entries also stop. Among rules that reroute only on a proposal, every guard veto is necessary, and a clean plan keeps its crossing orders. The guarantee has a price: no rule that never stores a vehicle in a crossing under arbitrary stops carries more than B/Ts per segment of B places and traversal time Ts. With binding orders, three planners deadlock in 80 of 126 runs across eight floors. Inside OpenRing, none of the 126 runs deadlocks. OpenRing's closed-loop throughput rivals or exceeds the best baseline's. Physics simulations show no deadlocks or overlaps.
Figures & tables
Fig. 1: The same arrivals in physics simulation. (a) Rings of full segments have closed, and the pink AGVs never move. (b) AGVs keep moving.
Tradition
Guarantee
Any planner
Price
AGV zones and windows
restricted states
no
–
Plan execution
planned order kept
no
–
Deadlock avoidance
no deadlock
no
–
Liveness supervisors
live, unit zones
own scheduler
–
OpenRing
safe, live, clearing
yes
B/Ts
TABLE I: OpenRing among the traditions it draws on.
Fig. 2: Model. (a) A segment stores B AGVs and its head wants the next segment. (b) A full wait cycle.
Fig. 3: Commitment. A move is committed a lead time ahead, so the AGV crosses at speed; a commitment may rest on a head that is committed to leave.
Fig. 4: OpenRing in five steps. A ring keeps moving while it has one free place, and stops for good when the last one is taken, so the guard refuses only that move. A wrong plan costs throughput, not safety.
Fig. 5: Why routes are checked and orders expire. (a) Route changes pass the same check as moves. (b) With room on every segment, an inconsistent order still stops the floor; after Tf the order lapses.
Fig. 6: The price of a guarantee. (a) A segment that may block can accept only what it holds. (b) Exceeding the bound gives up a condition; changing routes instead lowers the flow on a segment.
Fig. 7: The eight floors: one-way aisles with teal entries and grey exits; racks and buildings grey.
Method
Needs
Cell: deadlocked runs
Cell: delivered, 0.9
Delay
Closed loop
Isaac
route
control
timing
one turn
several
one turn
several
cell
AGVs/min
heavy
deadlocks
deadlocks
OpenRing
free
central
none
0/60
0/72
0.95
0.96
40
49
41
0/48
0/21
OpenRing, no planner
fixed
local
none
0/60
0/72
0.94
0.88
201
43
33
0/48
0/20
First-come
fixed
local
none
19/60
61/72
0.50
0.11
–
1
0
36/36
13/21
PIBT [ 26 ] , fixed
fixed
central
next step
38/60
31/72
0.00
0.35
–
–
–
–
–
PIBT [ 26 ]
free
central
next step
0/60
0/72
0.85
0.99
5
0 †
0 †
12/12 †
–
TABLE II: Methods and what they need, with deadlocks and throughput.
Fig. 8: Closed loop with full AGV bodies on the 6×6 grid at load 0.8 under heavy disturbance, at three instants. Teal: moving; pink: never moves again.
Fig. 9: Closed loop on the hall with a roundabout at load 0.8 without disturbance, same arrivals, at three instants, drawn as in Fig. 8 . The roundabout rule lets circulating AGVs go first and keeps an AGV whose exit is full waiting on the ring.
Fig. 10: All experiments: AGVs per minute, mean ± s.d. over seeds at the same load (6–12 runs per bar in (a)–(c), 9 in (d), (e), 3 in (f)–(k)); dark: no disturbance, light: heavy; pink: deadlocked runs. (l) Throughput relative to OpenRing, averaged over (a)–(k), and all deadlocked runs.
Fig. 11: Mean delay δi (Section VIII-A ) against the load on three grids (loads 0.6 and 0.8 on the 6×6 grid), closed loop: mean over runs without deadlock, shade ± 1 s.d.; first-come deadlocks.
Fig. 12: The fab loop in Isaac Sim at load 1.2 without disturbance, same arrivals, one run each, at 300s from the logged poses: no planner, PBS, PIBT and LaCAM alone with a binding order (top) and inside OpenRing (bottom); a deadlocked run is shown 60s after the deadlock. Colours as in Fig. 8 .
Fig. 13: Planners alone and inside OpenRing (OR) on the eight floors: deadlocked runs of three executed alone with a binding order (teal: none, pink: some) and AGVs per minute inside OpenRing (teal); h: heavy disturbance.
Fig. 14: Isaac Sim on the uneven 3×6 floor, same arrivals: first-come (top) and OpenRing (bottom) at four instants, from the logged poses; inset: AGVs standing for 20s or more under first-come (FC) and OpenRing (OR), triangles at the four instants. Colours as in Fig. 8 .
Fig. 15: The run of Fig. 14 in Isaac Sim at t=413s : first-come (left) and OpenRing (right). Pink: AGVs that never move again.
Fig. 16: (a) Disturbances, mean ± s.d. over seeds; above the OpenRing bar its gain over RHCR in paired runs, in % of the arrivals; above the RHCR bar its deadlocked runs (pink); (b) deadlocked runs under the heaviest disturbance.
Fig. 17: Ablation: parts on (filled) or off (open), the guarantees that remain for every planner (Theorems 1 and 3 ), AGVs per minute against OpenRing ( Δ ; OpenRing row absolute) and deadlocked runs, without and under heavy disturbance. The last two rows execute as RHCR and first-come; the runs are a subset of those of Table II .
Fig. 18: Theory against the cell model. (a) Fundamental diagram of a ring: Proposition 6 (lines: the vehicle limit, shared by every delay ω , and the hole limit for each ω ; capacity filled) and the cell model (circles); a full ring has zero flow, a state the guard never allows. (b) OpenRing without a planner on grids up to the capacity bound η⋆ .
Multi-Agent Path Finding (MAPF) seeks collision-free paths for multiple agents from their respective starting locations to their respective goal locations while minimizing path costs. Although many MAPF algorithms were developed, most of them rely on a common assumption on synchronized actions, where the actions of all agents start at the same time and always take a time unit. This assumption may limit the use of MAPF planners in practice. To get rid of this assumption, recently, an algorithm called Loosely Synchronized Rule-based Planning (LSRP) was proposed, which can find sub-optimal solutions for many agents. However, LSRP often finds poor quality solutions due to its unbounded sub-optimality. This paper develops a new anytime planner called LSRP* that can keep improving solution quality after the initial solution is obtained until the runtime budget depletes. We analyze the properties of LSRP* and test it against several baselines with up to 1000 agents on various maps. LSRP* can handle up to 25% more agents than LSRP and can reduce up to 40% of the solution cost found by LSRP.
Dachuan Liu, Shuai Zhou, Shizhe Zhao +1
Dachuan Liu, Shizhe Zhao, and Zhongqiang Ren are with Shanghai Jiao Tong University, Shanghai, China · Shuai Zhou is with the South China University of Technology, Guangzhou, China
Automatic Guided Vehicles (AGVs) substantially boost warehouse throughput, but routing large-scale AGV fleets remains challenging. Classical Multi-Agent Pathfinding solvers suffer from exploding combinatorial complexity and super-quadratic runtime, while relying on idealized grid or piecewise-linear motion models that mismatch real-world kinematics. Recent Reinforcement Learning (RL) solutions improve flexibility via decentralized agent policies but depend on discretized spatiotemporal representations, require millions of episodes to converge, and incur full-map observation at every step, which leads to large models, slow convergence, and high inference latency that violates real-time industrial control constraints. To address these bottlenecks, we propose HiRAD, a hierarchical RL framework for continuous-space AGV routing with real-time guarantees: (1) a step-level spatiotemporal representation that translates continuous motion into a differentiable RL problem, (2) a hierarchical strategy that splits heading choice from velocity control to reduce the action space, and (3) an asynchronous event-driven decision pipeline that lowers inference complexity from O(n^2) to O(n) and cuts per-step latency by as much as 71 percent. Across random graphs and two warehouse maps, HiRAD reduces makespan by 45 percent to 63 percent and shortens end-to-end runtime.
During the execution of Multi-Agent Path Finding (MAPF) plans in real-life applications, the MAPF assumption that the fleet's movement is perfectly synchronized does not apply. Since one or more of the agents may become delayed due to internal or external factors, it is often necessary to use a robust execution method to avoid collisions caused by desynchronization. Robust execution methods - such as the Action Dependency Graph (ADG) - synchronize the execution of risky actions, but often at the expense of increased plan execution cost, because it may require some agents to wait for the delayed agents. In such cases, the execution's cost can be reduced while still preserving safety by finding a new plan either by rescheduling (reordering the agents at crossroads) or the more general replanning capable of finding new paths. However, these operations may be costly, and the new plan may not even lead to lower execution cost than the original plan: for example, the two plans may be the exact same. Therefore, we estimate the benefit that can be achieved by single replanning in scenarios with delayed agents given an immediate state of the execution with a fully connected feed-forward neural network. The input to the neural network is a set of newly designed ADG-based features describing the robust execution's state and the impact of potential delays, and the output is an estimated benefit achievable by replanning. We train and test the network on a new labeled dataset containing 12,000 experiments, and we show that our proposed method is capable of reducing the impact of delays by up to 94.6% of the achievable reduction.
David Zahrádka, David Woller, Denisa Mužíková +2
Czech Institute of Informatics, Robotics and Cybernetics, Czech Technical University in Prague · Faculty of Electrical Engineering, Czech Technical University in Prague · Czech Institute of Informatics, Robotics and Cybernetics, Czech Technical University in Prague, Czechia. +1