cs.RONov 20, 2026

OpenRing: Deadlock-Free Execution of Any Planner on AGV Floors with One-Way Lanes

Authors: Zhihao Lin, Anh-Tu Nguyen, Hui Zhang, Yoshinobu Kawahara

Organizations: Graduate School of Information Science and Technology, The University of Osaka, Suita, Osaka 565-0871, Japan · LAMIH UMR CNRS 8201 Laboratory, Université Polytechnique Hauts-de-France, and INSA Hauts-de-France, Valenciennes 59313, France · School of Transportation Science and Engineering, Beihang University, Beijing 100191, China · RIKEN Center for Advanced Intelligence Project, Tokyo 103-0027, Japan

Abstract

Lifelong multi-agent path finding replans routes for automated guided vehicles, but deviations can invalidate a plan. With one-way lanes, a late vehicle or lost planner can close a ring of full segments. We separate how fast the floor runs from whether it keeps running. In OpenRing a planner proposes routes and an order, a local guard commits only moves and route changes that cannot close such a ring, and the order binds for a bounded time. Despite arbitrary proposals or planner loss, no ring closes. With two-place segments, traffic can continue under disturbances; progress is guaranteed once they end, and all vehicles exit if entries also stop. Among rules that reroute only on a proposal, every guard veto is necessary, and a clean plan keeps its crossing orders. The guarantee has a price: no rule that never stores a vehicle in a crossing under arbitrary stops carries more than B/TsB/T_s per segment of BB places and traversal time TsT_s. With binding orders, three planners deadlock in 80 of 126 runs across eight floors. Inside OpenRing, none of the 126 runs deadlocks. OpenRing's closed-loop throughput rivals or exceeds the best baseline's. Physics simulations show no deadlocks or overlaps.

Figures & tables

Explore similar work

Nov 7, 2026

LSRP*: Scalable and Anytime Planning for Multi-Agent Path Finding with Asynchronous Actions

Multi-Agent Path Finding (MAPF) seeks collision-free paths for multiple agents from their respective starting locations to their respective goal locations while minimizing path costs. Although many MAPF algorithms were developed, most of them rely on a common assumption on synchronized actions, where the actions of all agents start at the same time and always take a time unit. This assumption may limit the use of MAPF planners in practice. To get rid of this assumption, recently, an algorithm called Loosely Synchronized Rule-based Planning (LSRP) was proposed, which can find sub-optimal solutions for many agents. However, LSRP often finds poor quality solutions due to its unbounded sub-optimality. This paper develops a new anytime planner called LSRP* that can keep improving solution quality after the initial solution is obtained until the runtime budget depletes. We analyze the properties of LSRP* and test it against several baselines with up to 1000 agents on various maps. LSRP* can handle up to 25% more agents than LSRP and can reduce up to 40% of the solution cost found by LSRP.
Sep 9, 2026

HiRAD: A Flexible Large-Scale AGV Routing System

Automatic Guided Vehicles (AGVs) substantially boost warehouse throughput, but routing large-scale AGV fleets remains challenging. Classical Multi-Agent Pathfinding solvers suffer from exploding combinatorial complexity and super-quadratic runtime, while relying on idealized grid or piecewise-linear motion models that mismatch real-world kinematics. Recent Reinforcement Learning (RL) solutions improve flexibility via decentralized agent policies but depend on discretized spatiotemporal representations, require millions of episodes to converge, and incur full-map observation at every step, which leads to large models, slow convergence, and high inference latency that violates real-time industrial control constraints. To address these bottlenecks, we propose HiRAD, a hierarchical RL framework for continuous-space AGV routing with real-time guarantees: (1) a step-level spatiotemporal representation that translates continuous motion into a differentiable RL problem, (2) a hierarchical strategy that splits heading choice from velocity control to reduce the action space, and (3) an asynchronous event-driven decision pipeline that lowers inference complexity from O(n^2) to O(n) and cuts per-step latency by as much as 71 percent. Across random graphs and two warehouse maps, HiRAD reduces makespan by 45 percent to 63 percent and shortens end-to-end runtime.
Apr 28, 2026

Should I Replan? Learning to Spot the Right Time in Robust MAPF Execution

During the execution of Multi-Agent Path Finding (MAPF) plans in real-life applications, the MAPF assumption that the fleet's movement is perfectly synchronized does not apply. Since one or more of the agents may become delayed due to internal or external factors, it is often necessary to use a robust execution method to avoid collisions caused by desynchronization. Robust execution methods - such as the Action Dependency Graph (ADG) - synchronize the execution of risky actions, but often at the expense of increased plan execution cost, because it may require some agents to wait for the delayed agents. In such cases, the execution's cost can be reduced while still preserving safety by finding a new plan either by rescheduling (reordering the agents at crossroads) or the more general replanning capable of finding new paths. However, these operations may be costly, and the new plan may not even lead to lower execution cost than the original plan: for example, the two plans may be the exact same. Therefore, we estimate the benefit that can be achieved by single replanning in scenarios with delayed agents given an immediate state of the execution with a fully connected feed-forward neural network. The input to the neural network is a set of newly designed ADG-based features describing the robust execution's state and the impact of potential delays, and the output is an estimated benefit achievable by replanning. We train and test the network on a new labeled dataset containing 12,000 experiments, and we show that our proposed method is capable of reducing the impact of delays by up to 94.6% of the achievable reduction.