AI data centers are an emerging electricity demand, but limited local grid capacity could delay their connection and expansion. While existing operational strategies consider spatio-temporal workload flexibility, few studies address the strategic sizing and allocation of diverse accelerator archetypes with different capital and energy-efficiency trade-offs. This paper unlocks the flexibility potential of heterogeneous accelerators by jointly sizing and allocating different AI workloads (training, delay-tolerant batch work, and online inference requests) across sites and hours to meet the time-varying grid constraint at minimum cost. Workload-specific throughput and energy coefficients link these decisions to facility power. In a representative two-site case, heterogeneous sizing reduces daily cost by 6.5% relative to spatio-temporal scheduling with fixed capacity. When evaluated using workload-specific performance, a capacity design based on workload-averaged hardware coefficients costs 7.7% more than the proposed design. The proposed design also eliminates the envelope violations of an unconstrained design at a 0.25% daily cost increase. These results show how hardware heterogeneity and workload flexibility jointly shape economical, grid-compliant capacity plans.
Figures & tables
Model
Total (£)
CAPEX (£)
Elec (£)
QoS (£)
Penalty (£)
Model A (Rigid)
£25,060.8
£4,037.5
£789.0
£245.0
£19,989.2
Model B (Temporal)
£25,020.4
£4,037.5
£775.9
£245.0
£19,961.9
Model C (Spatio-Temp)
£5,653.8
£4,037.5
£862.6
£331.0
£422.7
Model D (Proposed)
£5,288.6
£4,120.2
£864.5
£303.9
£0.0
Model E (Workload-Agn.)
£5,773.5
£4,511.5
£976.2
£285.8
£0.0
TABLE I: Equivalent Daily Cost Breakdown
Fig. 1: Facility power with grid operating envelopes under Model D.