Latent world models plan by rolling out hundreds of candidate action sequences through a transformer predictor, so a single decision can take tens of seconds. Existing accelerations prune spatial tokens as in vision-language models, yet a sampling-based planner uses predicted costs only to rank candidates, so a rollout can be compressed freely as long as the ranking survives. We propose SOAR, a training-free method that adapts rollout compression to each planning decision. At every decision, SOAR probes a few candidates under several token budgets and keeps the smallest budget that preserves their ranking, so it compresses as far as the current decision allows, without task labels. A closed-loop study of more than 80,000 episodes fixes the rest of the rollout: the first step, which alone reads a real observation, stays exact, and the context frame is cached rather than recomputed. On seven navigation and manipulation tasks with frozen checkpoints, SOAR matches dense-level planning success at 2.3x speedup and retains 98% at 2.5x. Our code is available at https://github.com/starrywiki/SOAR.
Figures & tables
Figure 2: Computation in a planning rollout. Step 0 reads the encoded observation. Every later step recomputes a two-frame window, but only the newest frame’s output is kept; the context frame is recomputed solely to provide keys and values, and its output is discarded. Numbers mark the pruning axes of Sec. 4 .
Method
Success / Dense
Δ (points)
Speedup
Dense
1.00
–
1.00 ×
Random
0.60
− 19.6
2.13 ×
From vision-language models
ToMe [ 3 ]
0.51
− 24.4
2.13 ×
FastV [ 4 ]
0.66
− 16.6
1.35 ×
DART [ 15 ]
0.34
− 32.7
1.52 ×
Table 1: Spatial token selection at a 50% budget. Seven-task average success relative to dense, difference in points, and speedup, with the original checkpoints and CEM budget.
Axis
Configuration
Speedup
Avg.
Push-T
MW-R
–
Dense
1.00 ×
1.00
1.00
1.00
Space
64 positions
3.23 ×
0.48
0.03
0.66
128 positions
2.17 ×
0.90
0.73
1.08
192 positions
1.32 ×
1.00
0.81
1.26
Context
0 (single frame)
1.59 ×
0.82
0.95
0.18
64 positions
1.49 ×
0.95
0.90
1.32
Table 2: Pruning along four axes. Speedup and success relative to dense: seven-task average, Push-T and MW-R.
Figure 3: Where a planning rollout is redundant. (a) Success relative to dense versus speedup for the four pruning axes of Tab. 2 . (b) Success relative to dense on Push-T and MetaWorld Reach when halving the spatial positions or dropping the context frame.
Figure 4: Overview of SOAR. (a) Once per decision, SOAR rolls out M=16 candidates of the first CEM population under three nested token budgets and selects the smallest budget b⋆ whose Spearman correlation with the full budget reaches τ ; the probe values are schematic. (b) Every candidate rollout computes the first step in full, reads the context frame from a key–value cache instead of recomputing it, and computes the newest frame of later steps at b⋆ positions.
Method
Success / Dense
Speedup
Spatial selection
CostGrad [ 16 ]
0.84
2.13 ×
Guard-rank
0.89
1.92 ×
Checkerboard, 128 positions
0.85
2.22 ×
Temporal structure
First step full
0.94
1.89 ×
Table 3: Speed–quality comparison. Success relative to dense and planning speedup on paired batches.
Method
Maze
Wall
Push-T
MW-R
MW-RW
Rc-R
Rc-Pl
Avg.
Speedup
Dense
72
76
60
47
32
2
12
48.96
1.00 ×
SOAR, b=256
75
77
64
54
25
4
10
50.15
1.76 ×
SOAR, b=192
76
68
49
56
28
5
13
49.26
2.21 ×
SOAR, b=128
61
72
43
50
28
6
11
45.39
2.98 ×
SOAR, τ=0.9
75
74
56
52
23
6
11
49.26
2.31 ×
SOAR, τ=0.8
74
70
49
46
34
6
11
48.21
2.54 ×
Table 4: SOAR versus fixed budgets. Successes out of 96 episodes per task, except 32 on RoboCasa; average success in percent and speedup over dense. SOAR matches the 192-position budget on average at a higher speedup while avoiding its losses on Push-T and Wall.
Method
Maze
Wall
Push-T
MW-R
MW-RW
Rc-R
Rc-Pl
Avg.
Dense
79.51 (2.41)
77.08 (1.80)
65.28 (1.20)
48.26 (4.34)
23.61 (4.21)
16.67 (4.77)
35.42 (15.42)
49.40
Random 50%
64.93 (3.35)
34.72 (3.66)
11.81 (1.59)
35.76 (0.60)
10.42 (3.12)
12.50 (5.41)
38.54 (13.01)
29.81
ToMe 50%
49.31 (9.85)
34.72 (1.59)
11.46 (3.76)
20.14 (4.21)
8.33 (3.61)
12.50 (5.41)
38.54 (15.73)
25.00
FastV
31.60 (6.94)
26.39 (2.62)
55.56 (1.59)
35.42 (3.76)
23.61 (4.21)
18.75 (10.83)
38.54 (4.77)
32.84
DART
31.25 (4.54)
15.28 (1.59)
0.00 (0.00)
25.35 (4.21)
5.56 (0.60)
21.88 (3.12)
17.71 (10.05)
16.72
DivPrune 50%
65.97 (1.20)
38.54 (6.25)
34.38 (1.04)
30.21 (1.80)
7.29 (1.04)
7.29 (3.61)
35.42 (6.51)
31.30
Table S1: Spatial baselines: success rate (%). Means and sample SDs over evaluation seeds 1, 101 and 1001; 96 episodes per seed on the first five tasks and 32 on each RoboCasa task. Avg. weights tasks equally. CostGrad here uses the retained-position goal cost; CostGrad-copy in Tab. S4 uses the full-grid cost.
Method
Maze
Wall
Push-T
MW-R
MW-RW
Rc-R
Rc-Pl
Dense
45.864
45.922
45.847
19.933
19.895
50.540
50.625
Random 50%
20.642
20.633
20.584
8.974
8.978
25.770
25.898
ToMe 50%
20.723
20.686
20.685
9.003
9.035
25.870
25.972
FastV
48.418
33.087
33.117
14.405
14.393
31.106
31.165
DART
31.184
31.146
31.058
13.556
13.503
30.935
30.927
DivPrune 50%
20.554
20.609
20.561
8.984
9.014
25.848
37.272
Table S2: Spatial baselines: complete planning latency (seconds/decision). Mean complete planning time per decision on each task, with the original CEM search budget and the timing scope defined in Sec. A.3.
Method
Maze
Wall
Push-T
MW-R
MW-RW
Rc-R
Rc-Pl
Dense
15.67
15.67
15.67
15.71
15.71
14.74
14.74
Random 50%
5.74
5.74
5.74
5.78
5.78
9.46
9.46
ToMe 50%
5.86
5.86
5.86
5.90
5.90
9.75
9.75
FastV
15.45
15.45
15.45
15.49
15.49
16.49
16.49
DART
15.45
15.45
15.45
15.49
15.49
16.49
16.49
DivPrune 50%
5.74
5.74
5.74
5.78
5.78
9.46
9.46
Table S3: Peak PyTorch allocated memory (GiB). For ToMe, FastV and DART, the peak statistic includes warm-up calls.
Method
Maze
Wall
Push-T
MW-R
MW-RW
Rc-R
Rc-Pl
Avg.
CostGrad-copy
76.74 (6.78)
51.74 (4.21)
61.46 (3.76)
36.11 (8.36)
3.82 (2.41)
16.67 (1.80)
44.79 (6.51)
41.62
Guard-rank
76.39 (5.14)
63.19 (3.35)
52.08 (3.76)
52.78 (2.62)
14.24 (2.62)
11.46 (7.86)
37.50 (3.12)
43.95
Grid-guide
79.17 (1.80)
66.32 (5.74)
38.19 (5.74)
47.22 (3.01)
15.62 (2.76)
14.58 (6.51)
34.38 (10.83)
42.21
Table S4: Recovery-interface controls: success (%). Same evaluation seeds and episode counts as Tab. S1 . Parentheses denote sample SD over evaluation seeds. CostGrad-copy uses the full-grid goal cost.
Seed
Dense
Spatial 128
First full
Single
Split
5001
46.73
41.82
48.21
38.24
48.81 †
6001
54.02
42.11
51.04
44.94
55.80
8001
42.71
35.57
39.58
33.04
40.48
9001
49.70
44.05
46.43
42.56
50.00
Table S5: Temporal configurations in the original four matched evaluations. Seven-task macro success (%). Single drops the previous frame. † The split is selected using seed 5001, so this entry is in-sample. These four seeds underlie the first-step anchoring comparison in the main paper.
Seed
Maze
Wall
Push-T
MW-R
MW-RW
Rc-R
Rc-Pl
5001
0.0
− 3.1
− 3.1
− 32.3
− 17.7
− 6.2
3.1
6001
1.0
1.0
2.1
− 35.4
− 13.5
− 18.8
0.0
8001
− 14.6
− 1.0
1.0
− 42.7
− 16.7
3.1
3.1
9001
0.0
− 3.1
− 3.1
− 31.2
− 12.5
− 3.1
3.1
10001
− 4.2
4.2
1.0
− 34.4
− 19.8
− 18.8
0.0
11001
2.1
5.2
5.2
− 34.4
− 30.2
3.1
6.2
Table S6: Effect of dropping the context frame. Single-frame success minus dense success, in percentage points. Each seed has 96 episodes per task on the first five tasks and 32 on each RoboCasa task. Differences are rounded to one decimal place.
Context rule
Positions
Speedup
Success
Dropped
0
1.92 ×
40.8
Checkerboard
64
1.56 ×
46.4
Top motion
64
1.59 ×
45.1
Random
≈ 162
1.19 ×
48.6
Motion, 90% energy
≈ 162
1.19 ×
49.4
Complete (dense)
256
1.00 ×
49.0
Table S7: Context amount and selection. Macro success (%) over two evaluation seeds, or 1,088 episodes per row. Only the previous frame is reduced. Speedup is the inverse task-normalized latency ratio.
Task
Decisions
Median ρ192
Median ρ128
Maze
8
0.84
0.64
Wall
8
0.91
0.83
Push-T
8
0.87
0.85
MW-R
56
0.97
0.95
MW-RW
56
0.95
0.93
Rc-R
48
0.99
0.99
Table S10: Development ranking diagnostics. Spearman correlation between reduced-budget and 256-position cached probe costs. The complete planner remains at 256 positions. These diagnostic decisions are excluded from formal success tables.
Method
Success
Dense
Seconds
Speedup
SI
50.69
60.53
11.021
2.333 ×
Scope
61.60
60.58
12.348
2.046 ×
DDP
41.30
60.16
16.463
1.557 ×
Table S12: Trained-control efficiency. Success values are five-task macro percentages. Seconds averages sparse complete-planning latency over all recorded non-warm-up decisions. Speedup is the corresponding dense average divided by Seconds; the dense averages are 25.712, 25.265 and 25.625 seconds for SI, Scope and DDP, respectively.
Method
Maze
Wall
Push-T
MW-R
Dense
73.61 (11.55)
80.90 (4.20)
61.11 (2.46)
54.51 (4.02)
Grid 50%
67.36 (11.55)
76.04 (2.25)
37.85 (3.84)
39.93 (1.30)
Fixed 20
74.65 (11.95)
82.64 (4.68)
53.12 (4.50)
39.93 (4.36)
Fixed 80
74.65 (12.45)
78.12 (3.71)
57.64 (1.77)
50.69 (4.36)
Risk-adaptive
75.00 (12.84)
81.60 (5.66)
57.29 (1.70)
44.79 (6.42)
Stratified
73.96 (11.69)
82.64 (6.03)
57.99 (1.96)
49.31 (5.66)
Table S13: Dense rechecking during sparse CEM: success (%). Seeds 2001, 3001 and 4001; 1,632 episodes per row. Parentheses give the population SD over the three evaluation seeds. All sparse searches use 128 checkerboard positions; rechecking evaluates selected trajectories at 256 positions. Fixed 20/80 denote fixed query counts; Stratified denotes stratified witnesses.
Method
Success
Seconds
Ratio
Dense
49.80
43.538
1.000
Grid 50%
41.27
18.629
0.438
Fixed 20 rechecks
44.99
21.833
0.514
Fixed 80 rechecks
47.42
29.466
0.697
Risk-adaptive expansion
46.58
30.065
0.714
Stratified witnesses
47.57
29.993
0.712
Table S14: Dense rechecking: latency–success trade-off. Success is seven-task macro percent, Seconds is task-averaged complete planning time, and Ratio is the average per-task latency ratio to dense. The ratio is not obtained by dividing the Seconds column.
Task
Dense
Grid
G+P
Mag.
Comp.
Shuf.
Maze
60.42
54.17
54.17
54.17
53.12
45.83
Wall
75.00
77.08
77.08
67.71
71.88
39.58
Push-T
59.38
42.71
42.71
51.04
54.17
15.62
MW-R
48.96
38.54
38.54
30.21
29.17
35.42
MW-RW
26.04
17.71
17.71
7.29
11.46
14.58
Rc-R
25.00
9.38
9.38
15.62
12.50
18.75
Table S15: Action-response selection: success (%). Evaluation seed 3001; 544 episodes per method. G+P: Grid plus probes; Mag.: response magnitude; Comp.: response complementarity; Shuf.: shuffled correspondence. Dense and Grid are the seed-3001 controls from the rechecking batch.