Synchronous reinforcement learning (RL) for large language models proceeds through a repeated rollout--barrier--update loop. Each update must wait for a fixed number of complete, group-relative training samples, yet individual response lengths and reward outcomes vary widely and only emerge as generation progresses. Static admission and unconditional completion therefore leave accelerators idle in some steps, and waste computation generating samples that will never contribute to the current update. We present ARC, a closed-loop rollout architecture that governs synchronous RL rollout at group granularity. ARC uses Calibrated Streaming Backfill to judge from partial observations whether a group is still worth completing, backfilling a fresh candidate immediately when it is not; Deferred Group Completion to park an uncertain early stop and resume it later instead of discarding it outright, bounded by a resume-cycle limit that guarantees termination; and Adaptive Admission and Pipelining to order admitted samples by early-measured duration and to admit further candidates only while expected supply still falls short of the target number of accepted groups. Under online evaluation, ARC reduces rollout time by 37.4%, a 1.60× speedup, and improves effective GRPO throughput by 50.1% over existing baselines, while directly recovering 98.9% of the training groups that would ultimately have been kept.
Figures & tables
Figure 1. Sample reward accumulation. Green and red denote sample rollouts with rewards=1 and =0 , respectively. Upon completion, group G1 with zero-variance is rejected ( × ), whereas the samples ( ∘ ) await batch selection. At the synchronization barrier (vertical dashed line), the valid groups that remain are retained uniformly at random until the B -group batch fills, here G2 and G4 marked keep , while the rest are discarded even though they are equally valid, here G3 marked drop .
Figure 2. Statistics from 88 recorded production rollout steps. (a) Per-step group keep rate. (b) CDF of sample response length at a representative step. (c) Share of samples against share of generated tokens, by length band, at the same step.
Figure 3. Comparison of priority scheduling strategies under otherwise identical runtime settings.
Figure 4. Overview of ARC .
Figure 5. CSB ’s stop-vs-continue decision, contrasted for two groups at the same instant ( S=4 , n=2 ): (1) G1 ’s completed samples agree ( c=0 ) while G2 ’s already disagree ( c=1 ); (2) the calibration table returns a low pkeep for G1 and a high one for G2 , and the cost-aware rule (Equation 2 ) decides; (3) G1 is stopped, parked in DGC ’s pool and replaced by an oversampling candidate, while G2 continues, re-evaluated at every new sample completion. Values are illustrative.
Role
Symbol
Meaning
Belief
pkeep(c,n)
calibrated probability the completed group is kept.
Cost
Crem , Crepl
remaining-generation vs. replacement cost.
Pool state
R , J , p0
fresh candidates, concurrent stop seekers, base keep rate.
Threshold
p∗(n,R,J)
stop when pkeep<p∗ .
Table 1. Notation of the cost-aware stopping rule.
Figure 6. DGC ’s park/resume lifecycle for the three groups stopped in Figure 5 : G3 confirms its stop, G1 is a Keep that discarding would have lost, and G4 ages out. Values are illustrative.
Metric
Qwen3.5-
Qwen3.5-4B
35B-A3B
phase 1
phase 2
Workload
long CoT
instruction
instruction
Target Groups/Step ( B )
16
128
128
Samples/Group ( S )
16
16
16
Response Budget
100K
16K
32K
Rollout Steps
20
220
135
Table 2. Model and workload configurations.
Metric
Slime
Seer
ARC ( CSB only)
ARC
Oracle ARC
Rollout time (s)
194,999
193,372
119,152
122,087 ( −37.39% )
81,221
Step time (s)
219,889
219,330
146,286
146,538 ( −33.36% )
106,111
GPU rollout throughput (tokens/GPU/s)
95.80
99.70
171.90
153.69 ( +60.43% )
236.57
Effective GRPO throughput (groups/h)
5.24
5.25
7.87
7.86 ( +50.1% )
10.86
Table 3. End-to-end comparison over 20 steps ( B=16 , S=16 ). Lower is better for times, higher for throughput; bold is the full ARC configuration with its change versus Slime. Oracle ARC is a trace-replay bound.
Benchmark
Slime
ARC ( CSB only)
ARC
Math
MATH-500
98.05%
97.70%
97.75%
AIME24
91.46%
91.04%
91.25%
AIME25
90.00%
89.17%
90.42%
AIME26
91.25%
91.25%
89.38%
HMMT-Feb25
86.46%
85.63%
85.83%
Table 4. Downstream accuracy of each checkpoint: math and instruction-following/reasoning benchmark groups.
Statistic (tokens)
Slime
ARC ( CSB only)
ARC
Mean
27,582
29,772
27,485
P50
16,403
19,774
17,746
P90
71,168
72,378
70,062
P99
96,456
97,174
94,978
Truncation rate
1.86%
2.48%
1.80%
Table 5. Per-sample response length within the groups accepted into training.
Table 8. DGC ’s effect on rollout composition. Percentages are the change against Slime.
Figure 7. DGC capacity sweep on the two recorded traces: recall and extra tokens vs. park-pool capacity M ; M=0 is CSB with DGC disabled.
Figure 8. The 355-step Qwen3.5-4B run. Dashed line in the top panel is the workload’s own true-KEEP recall and rate, which rises after the budget change; the bottom panel shows park-pool occupancy against its capacity.
Slime
ARC ( CSB only)
ARC
Phase 1: 16K budget, 220 steps
Makespan (h)
157.3
71.8
57.9
Reduction
—
54.4%
63.2%
Recall
100.0%
88.5%
99.6%
Phase 2: 32K budget, 135 steps
Makespan (h)
112.3
66.3
53.2
Table 9. Qwen3.5-4B: two consecutive phases of one run, B=128 , S=16 . Recall is true-KEEP recall; CSB only is ARC with DGC disabled.
M
Recall
Refused
16 (default)
92.9%
9859
32
95.3%
6248
64 (used here)
99.6%
476
256
100.0%
0
Table 10. Park-pool capacity scan on Qwen3.5-4B (phase 1). “Refused” counts learned stops denied a park slot because the pool was full.
Reinforcement learning studies how agents learn sequential decisions from rewards and interaction, balancing exploration, performance, safety, and adaptation.