Sustained lunar-base operations require robots that restore equipment and deliver cargo under conditions unforeseen before deployment. Flown space autonomy executes pre-validated procedures and enters a safe hold outside their scope, whereas foundation models synthesize plans on site that cannot be verified before execution. We formulate these operations as safety-constrained contingent planning with irreversible actions, erroneous records, three-valued physical evidence, and costly, deadline-constrained sensing. We propose asymmetric knowledge-level replanning (AKR), which treats the planner as an untrusted black box: reversible actions run on the planner's assumptions, and irreversible actions run only after a minimum-cost sensing cover verifies every precondition. Under sound measurements, no irreversible action executes on a false precondition for any planner or record, the sensing cost before an irreversible action is bounded below for every sound knowledge-based policy, and execution with a complete planner ends in a verified goal or a certified hold. AKR executed no hazardous action in 21,000 Monte Carlo trials with sound observations or in 58 full-stack runs; the FF-Replan acting rule executed one in 7% of those trials. The median AKR run took 1.10 times the fastest run on the same mission, against 1.50 under the K-replanner acting rule. AKR completed 20 of 21 contingency and sequential-fault runs with an unchanged task model; the original PLEXIL and EUROPA→PLEXIL procedures completed none.
Figures & tables
Figure 1: The motivating repair of Section 2.1 under existing autonomy and under AKR. All frames are replayed from full-stack runs of this mission ( Section 4.6 ): the original PLEXIL procedure and the FF-Replan rule in the inserted-proposal condition in the middle row, and one AKR run in the bottom row.
Figure 2: AKR between the foundation-model planner and the rover, shown on the two actions of the motivating repair. The three frames are replayed from full-stack runs and show the pick, the antenna that carries a ground request, and the removal.
Figure 3: Simulation platform: (a) the south-polar site, (b) the outpost and its equipment, (c) the rover LunarBot, (d) the interfaces of a serviced unit, shown on PDU-1, and (e) four physical operations from the full-stack runs.
Sensing action
Realization
Cost (s)
Deadline (s)
Telemetry
equipment state service
0
none
Localization, arm state
pose estimate, joint encoders
0
none
Camera question
RGB image, vision-language call
0.02
none
Held-item camera
wrist camera (holding or empty)
0.02
none
Serial-plate read
arm viewpoint, Data Matrix decode
5.7
none
Held-item check
put down, read plate, pick up
153.6
none
Table 1: Sensing actions and their physical realization.
Action
Measurements
Unverified when
Navigate, dock
localization pose against band
pose estimate absent
Press
button contact depth, retreat
equipment effect (decided by telemetry or camera)
Pick
jaw angle, lift, image flow
flow inconclusive or item unknown
Place, hand over
jaw open, withdrawal, settled view
destination out of view or item unknown
Stow, arm ready
joint encoders
never
Table 2: Evidence rules and the measurements that decide them.
Goal
Condition
Reference missions (7)
Restore PDU-2
Overcurrent breaker trip at PDU-2; a reset restores the unit.
Restore BESS
Overcurrent breaker trip at BESS; a reset restores the unit.
Restore ISRU
Overcurrent breaker trip at ISRU; a reset restores the unit.
Locate and restore faulty equipment
Brief reports PDU-2; BESS is the unit tripped on overcurrent.
Deliver spare ORU to PDU-3
ORU-0417 from depot slot 0 to the PDU-3 spares shelf.
Table 3: Goals and conditions of the sixteen missions in four classes. A dagger marks the six hidden-cause missions.
Acting rule
Reversible action
Irreversible action
K-replanner rule
known true, after cover
known true, after cover
FF-Replan rule
not known false
not known false
AKR
not known false, each guess once
known true, after cover
Table 4: Admissibility conditions of the three acting rules.
Configuration
Missions
Runs
AKR, base condition
all 16
48
K-replanner rule, base condition
9 non-reference
27
FF-Replan rule, base condition
9 non-reference
27
AKR (7) and FF-Replan rule (9), inserted proposals
2
16
AKR, early Earth set ( Tvis=925 s)
1 (no-spare)
3
PLEXIL and EUROPA → PLEXIL, original
all 16
32
Table 5: Full-stack runs: 121 runs of the three acting rules and 44 baseline runs.
Figure 4: Safe execution under the three acting rules. (a) to (c) Trials with a hazardous action in the main grid, with 1000 trials per point and rule, against the planner fault rate ε , the record error rate pR and the observation error rate η ; the tested values of η are spaced equally, and the vertical line marks the rate measured on the rover. (d) What was known of the false precondition in the 2033 trials of the FF-Replan rule with a hazardous action. (e) The no-spare trials of the ground-refusal grid. (f) Decision points in the full-stack runs.
Base condition
Inserted proposals
AKR
FF-Replan rule
AKR
FF-Replan rule
Runs
12
12
7
9
Decision points withheld
8
0
4
0
Covers set
7
0
3
0
Median cover cost (s)
5.7
n/a
5.7
n/a
Removals without an observed grant
0
2
0
2
Table 6: Decision points and hazardous actions in the full-stack runs. The upper block pools the no-spare repair and the three non-reference deliveries; the lower block counts all runs of the two rules.
Figure 5: Cost of the three acting rules. (a) Sensing time paid against the lower bound cD⋆ of Theorem 2 for the 53 covers of the full-stack runs, on logarithmic axes. (b) Covers set in the 27 base runs of each rule on the nine non-reference missions, by the class of the action that demanded them, with the sensing time paid. (c) Performance profiles of mission time in the same runs; the vertical lines mark the median time ratios of AKR and the K-replanner rule. (d) Median sensing time per trial on the ten solvable missions of the main grid against the record error rate pR .
AKR
K-replanner rule
FF-Replan rule
Evaluator successes (of 27)
25
25
24
Medians over the 27 runs
Mission time (s)
991.3
1097.5
800.9
Time ratio
1.10
1.50
1.13
Actuation actions
24
32
21
Sensing actions
3
5
3
Table 7: The three acting rules on the nine non-reference missions (27 base runs per rule).
Figure 6: Recovery and termination. (a) Cumulative distribution of the episodes per trial in the episode grid at ρ=0.847 and at ρ=0.4235 , with the bound N of Theorem 3 . (b) Completion on the contingency and sequential-fault missions, counted in runs for AKR and in missions for the original and the revised procedures. (c) Six frames replayed from sequential-fault run 1 under AKR, each with its mission time; the insets enlarge the indicator lamp of the unit.
Ending
AKR
FF-Replan rule
Runs
58
36
Success, goal verified
48
25
Certified hold after a refusal
3
3 a
Certified hold on a late request
1
0
Planner gave up
item at rest off any support
5
1
Table 8: How the 94 runs of AKR and the FF-Replan rule ended.
AKR
PLEXIL
EUROPA → PLEXIL
Evaluator successes over runs
Reference (7 missions)
19/21
7/7
6/7
Contingency (6)
17/18
0/6 → 4/6
0/6 → 6/6
Sequential fault (1)
3/3
0/1
0/1
Wrong record (2)
5/6
2/2
2/2
Median time of successful runs (s)
Table 9: Coverage, mission time and effort of AKR and the two baselines. An arrow separates the original from the revised baseline.
(a) Actuation skill
Executions
Full effect
Conclusive judgments
Judgment error (%)
Dock at feature
1003
0.879
0.989
0.29
Dock to pose
282
0.943
0.940
0.15
Pick
259
0.710
0.675
0.00
Place
153
0.935
0.776
0.63
Handover
44
0.750
0.773
0.74
Removal
14
0.857
0.413
0.00
Table 10: Physical evidence over the 121 runs of the three acting rules: (a) effect realization and judgments per actuation skill, navigation excluded, and (b) sensed values per source. Conclusive judgments are counted per effect judgment, and the last row of (a) pools the 51,654 judgments of all skills, 37,990 of them from docking at a feature.