Abstract

In a Houston 2024 replay, replacing a fixed 20 percent battery reserve with a county-risk threshold raises observed five-hour backup coverage from 75.0 percent to 86.5 percent and adds USD 10.2 in modeled annualized margin per home (paired 95 percent interval: USD +1.7 to USD +21.7). The paired coverage-gain interval includes zero. This is a conditional simulation result, not measured company reliability. Residential batteries face this tradeoff because market discharge consumes energy also needed for household outages. We release HomeFleet-ERCOT, combining observed prices and county outages with identified simulated homes and causal controller inputs. We compare independent-home optimization with 21 proximal policy optimization (PPO) training runs; ten promise-cost candidates span 31.1 percent-96.3 percent backup coverage. Of these, 10 have lower modeled margin than fixed 20 percent, and 3 also have lower coverage. Chronological, geographic, fleet, and storm tests examine transfer. An alert charging override has a conditional energy-and-power sufficiency guarantee, but only 19.5 percent of 41 county mass-outage episodes provide enough continuous warning for every battery preset. Synthetic tests include short, missed, and false warnings, load uplift, capacity loss, and dropout. A static AC audit retains existing feeder violations; aging comparisons expose model sensitivity. The released benchmark, controllers, and checkpoints provide a reproducible basis for comparing these tradeoffs. This work supports the design of residential battery programs that assess market value and household backup service together.

Figures & tables

Appendix figures & tables14 assets

Supplementary material from the paper’s appendix.

Appendix

Explore similar work

Oct 19, 2026

Learned Control Variates for Rare Grid-Outage Estimation at Electric Vehicle Charging Stations

Public charging of electric vehicles (EVs) adds a large and synchronized load to the distribution feeders. In most networks, it is rare to overload a feeder at the same time. When it does happen, the consequences can be severe: an overloaded feeder stresses its transformers and can trigger cascading outages across a city. Planners who design for high reliability therefore need to estimate very small outage probabilities. To that end, plain Monte Carlo estimation with an expensive grid simulator can require a prohibitively large number of runs for this task. To reduce the number of runs, we propose a control variate (CV) built from a learned classifier of the outage, trained on cheap observable features such as temperature and load forecasts. We show that for any binary learner, the variance reduction is an explicit function of its recall and false-positive rate. Furthermore, we show that control variate based on a Gaussian proxy of the load loses its effect as outages become rarer, while a learner with non-vanishing precision keeps removing a fixed fraction of the variance even in the extreme rare-event regime. We verify these results in numerical experiments using a feeder-overload simulator across three orders of magnitude of outage probability and obtain that even weak learner with a single feature can remove a quarter of the variance, while a boosted-tree learner is able to remove about 60%. We then apply the estimator to the feeder network of Surabaya, Indonesia, in which the Gaussian load model leaves every feeder three to seven times the one-day-in-ten-years blackout target. At the same simulation budget, planning the reserve with the learned CV and a 95% confidence limit reduces the city-wide blackout days by a third compared with Monte Carlo. These results show that learned control variates can help planners design distribution grids that stay reliable against rare outages.
Sep 20, 2026

Cost-Aware Reinforcement Learning with Action Masking and Projection for Battery Energy Storage Dispatch under Suppressed-Spread Market Shifts

Battery energy storage system (BESS) dispatch must preserve operational feasibility while declining price spreads reduce the margin available to pay for cycling. We study a proximal policy optimization (PPO) controller whose pre-selection physical action mask and emergency projection are separated from a causal, forecast-informed economic advisory. All forecast-dependent methods receive the same causal 24-step forecast and grid-side settlement. Across five PPO seeds, advice-on net profit is 30.59 and 18.04 USD per 336-hour T1 and T2 window, versus 36.77 and 22.94 USD for proxy-cost MPC; PPO remains below this reference in both periods. Advice raises T2 profit from 16.45 to 18.04 USD while reducing throughput, but is immaterial in T1. On disjoint weekly blocks, PPO is stable under daily, weekly, and blended seasonal forecasts, weakens under persistence, and remains below proxy-cost MPC. Paired diagnostics localize changes to the observed 5-10 USD/MWh regime with mixed SoC-dependent effects. An M0-M6 ablation shows that mask removal sends thousands of infeasible requests to projection, while removing both physical layers exposes ramp violations. The evidence separates economic screening from feasibility enforcement without claiming formal safety, lifecycle-optimal aging, or RL dominance.
Jun 14, 2026

Hidden Degradation Costs in Energy-Cost-Only HEMS Optimisation: Study on Battery and PV Sensitivity

Residential battery energy storage systems (BESS) are increasingly deployed alongside photovoltaic (PV) generation to reduce household energy costs under volatile time-of-use (TOU) tariffs. Model predictive control (MPC) is a widely adopted optimisation strategy for home energy management systems (HEMS), typically formulated to minimise net energy cost, subject to physical and operational constraints. However, battery degradation is rarely embedded in the optimisation objective, meaning its cost is unquantified and aggressive; high-cycle-count strategies could incur significant losses once deployed to physical systems. This paper presents a receding-horizon mixed-integer linear programming (MILP) baseline for a UK residential HEMS, using demand data from the REFIT dataset. A 3 by 3 sensitivity study is conducted across three battery sizes and three PV array sizes, with post-hoc degradation cost estimated using the Naumann stress model and rainflow cycle counting. Results show that degradation remains constant for each battery size and can exceed energy cost savings by up to 1,060 %. These results demonstrate that energy-cost-only optimisation systematically underestimates the true system cost, motivating a degradation-aware control formulation.