Solving the Aircraft Disassembly Scheduling Problem

Authors: Charles ThomasPierre Schaus

Organizations: Institute of Information and Communication Technologies, Electronics and Applied Mathematics (ICTEAM), UCLouvain, Place Sainte Barbe 2/L5.02.01, Louvain-la-Neuve, 1348, Belgium.

Abstract

Dismantling aircrafts reaching their end of life is a complex endeavour that is necessary in terms of sustainability but yields small income margins for air transport companies. An efficient scheduling of the disassembly procedure is thus crucial to ensure the profitability of the process and incentivize practice. This is a large scheduling problem that involves thousands of tasks and many different constraints: Extracting parts that are destined to be reused requires technicians with specific certifications and equipment. Extraction operations might be subject to precedence relations. Furthermore, the aircraft must be kept balanced during the whole process. Finally, some of the locations of the aircraft have a limited space that caps the number of technicians able to work there concurrently. This article presents the problem in details and proposes two approaches to solve the problem: a Constraint Programming model and a MIP model. The models are tested on instances of varying sizes involving up to 1450 tasks, which are based on real operational data provided by an industrial partner.

Explore similar work

Sep 4, 2026cs.AI

Planning and Scheduling Business Processes under Control-Flow Uncertainty: Extended Version

Scheduling activities in business processes can improve efficiency (e.g., reduce makespan), but is challenging because the exact sequence of activities required to complete a case is often uncertain due to decisions based on data that emerges during execution. Nevertheless, probabilistic information regarding such decisions can often be estimated or derived from historical execution logs, and can help anticipate which execution paths are likely to lead to successful completion. Planning with particular execution paths affects feasibility, i.e., the probability of successful completion, and the expected number of superfluous activities that are planned but never executed. We frame the problem as a chance-constrained optimization problem and present two formulations: A decomposed approach with two stages, a planning stage that minimizes the expected number of superfluous activities subject to a feasibility constraint, and a scheduling stage that minimizes the makespan over the planned activities; and an integrated approach that combines planning and scheduling into a single formulation. Evaluation on two real-world and one synthetic dataset shows that the integrated approach yields superior makespans but is intractable at scale, while the decomposed approach scales to large settings.
Michel Kunkler, Stefanie Rinderle-Ma
Aug 9, 2026cs.RO

PEEL: Parallel Extraction for Long-Horizon Disassembly Planning via Scale-Invariant Sampling

Long-horizon multi-part object disassembly requires robots to compute feasible sequences of collision-free removal motions, even in the presence of tight, narrow escape corridors. To efficiently solve such disassembly problems, we propose Parallel Extraction for Long-Horizon Disassembly (PEEL), an algorithm which efficiently computes disassembly motions for object assemblies and feeds them to a robot manipulator for execution. PEEL uses sampling-based motion planning to compute single-object motions through the use of a scale-invariant sampling scheme, where the object scale is estimated in a burn-in phase and a subsequent directional sampler exploits the scale. This sampling scheme is integrated into a multi-arm bandit rapidly-exploring random tree (MAB-RRT) planner, which switches between different samplers depending on the reward signal received. Using MAB-RRT, the PEEL algorithm runs a batch of planners in parallel to obtain an ordered graph specifying the sequence in which object parts have to be removed. We show that MAB-RRT can efficiently solve single-part disassemblies with 100 percent success rate on 76 assemblies, and that it is robust to its parameters. By integrating MAB-RRT into PEEL, we solve four long-horizon disassembly problems using the Fetch manipulator robot involving 10 to 17 individual object parts.
Servet B. Bayraktar, Andreas Orthey, Zachary Kingston +1
May 14, 2026cs.AI

PyCSP3-Scheduling: A Scheduling Extension for PyCSP3

PyCSP3^3 provides a productive way to build constraint models for solving combinatorial constrained problems and export them to XCSP3^3, preserving a complete separation between modeling and solving. However, it lacks native support for scheduling abstractions such as interval variables, sequence variables, and resource functions. As a result, scheduling models must be encoded with low-level integer variables and manual channeling constraints, even though PyCSP3^3 already provides global constraints like NoOverlap and Cumulative on integer arrays. We present PyCSP3^3 Scheduling, a library that adds scheduling abstractions to PyCSP3^3 through 53 dedicated constraints and 27 expressions, and compiles them down to standard PyCSP3^3/XCSP3^3 constraints, maintaining the modeling/solving separation that underpins the PyCSP3^3 ecosystem. On 261 paired instances across 17 model families (5 runs each), both formulations produce identical objectives on all 72 doubly-proved optimal pairs and nearly half of the families (8/17) remain structurally unchanged after compilation; however, runtime performance diverges across families, with clear gains on some (up to 5.8x) and regressions on others due to the overhead of compilation decompositions. Code and benchmarks are available at: https://github.com/sohaibafifi/pycsp3-scheduling
Sohaib Afifi