From Accounting to Coordination: A Virtual Water-Aware Electricity-Computation-Water Nexus Framework for Data Center Dispatch

Authors: Haiyang YouChengwei LouJin ZhaoYue ZhouLu ZhangJin Yang

Abstract

The expansion of data centers (DCs) drives a sustained increase in electricity demand and associated water withdrawals at generation sites. These withdrawals occur at generation sites and are virtually allocated to demand based on network power flows. Consequently, the actual water footprint of a specific load varies dynamically with generation dispatch and network conditions. Existing approaches typically rely on static statistical accounting to quantify these water footprints. However, such static methods fail to capture how dispatch optimization and workload relocation dynamically affect water withdrawals. As a result, static statistical accounting approaches remain decoupled from the optimization process, rendering them incapable of guiding workload relocation or power dispatch to mitigate water stress. To address this limitation, this paper develops an operational electricity-computation-water (ECW) nexus framework that internalizes virtual water impacts directly into power system dispatch. The framework represents dispatch optimization as a differentiable optimization layer embedded within a deep learning architecture, enabling efficient end-to-end learning of coordination policies while preserving operational feasibility. Combined with fixed-point coordination, the framework enforces consistency between virtual water attribution and physical generation-side withdrawals. Case studies on the IEEE 30-bus and 118-bus test systems demonstrate reliable convergence, exact power-water consistency, and reductions of approximately 3-5% in generation-related freshwater withdrawals under water-constrained conditions.

Explore similar work

Jun 5, 2026cs.CY

The Hidden Water Geography of U.S. Hyperscale Data Centers in the AI Era

Water use by data centers is routinely reported as a single footprint, but water is consumed through two physically distinct pathways: at the site for cooling and in the power system that generates electricity. We mapped both pathways for 472 U.S. hyperscale facilities by linking facility locations to electricity regions, hydrologic basins, and water-stress data. Under baseline assumptions, operational water consumption totals approximately 300 GL yr^-1 (range 205-451 across scenarios), with electricity-related water contributing three-quarters of the total. The two pathways produce different hotspot geographies: direct cooling burdens concentrate in stressed western and south-central basins, whereas electricity-related burdens concentrate in a few eastern grid regions with fossil-heavy supply. Just 3 of 24 hosting balancing authorities account for 59% of electricity-related water. Separating pathways identifies which decisions matter where: cooling design and water sourcing locally, electricity planning and procurement regionally
Gianluca Guidi, Francesca Dominici
Jun 23, 2026cs.DC

Power-Flexible AI Data Centers: A New Paradigm for Grid-Responsive Compute

The rapid expansion of artificial intelligence (AI) infrastructure is driving unprecedented growth in electricity demand from data centers. Traditional power-system planning treats large computing facilities as inflexible peak loads, leading to costly infrastructure upgrades and long delays in grid interconnection. Recent work has shown that AI clusters can reduce electricity consumption during peak demand through software-based workload orchestration. This article explores how modern GPU-based AI data centers can operate as grid-interactive assets that respond dynamically to power system conditions. We describe an architecture integrating grid signals, workload scheduling, and power telemetry for fine-grained cluster power control. Experimental results from a real-world deployment on a 130 kW GPU cluster demonstrate multiple forms of flexibility, including rapid load reduction, sustained curtailment, and carbon-aware operation while preserving service levels for priority jobs. We further demonstrate performance-aware load shifting across geographically distributed clusters, enabling workloads to migrate toward regions with lower grid stress. Together, these capabilities transform AI infrastructure from static electricity consumers into flexible resources that support grid reliability, accelerate interconnection, and improve computing sustainability.
Chris Williams, Philip Colangelo, Ayse Coskun +15
Jul 29, 2026cs.LG

PowerAtlas: Towards Electricity-Computing Co-Scheduling for Power Systems

The rapid growth of AI workloads is turning data centers into large-scale, volatile, yet spatiotemporally flexible grid loads, creating an urgent need for coordinated electricity-computing scheduling. Under stringent grid constraints, schedules from general-purpose large language models (LLMs) are often infeasible, causing line-flow violations and unserved load. We present PowerAtlas, an LLM-agent framework for electricity-computing co-scheduling that integrates historical instances, domain knowledge, and physical constraints to produce joint decisions satisfying both grid operational rules and the service-level agreements (SLAs) of computing tasks. Working with a provincial power utility in China, we built an experimental electricity-computing network and validated the decision loop on real data-center data; from de-identified operational data we further constructed ECBench, a benchmark of 2,000 scheduling instances with oracle-optimal solutions. Experiments across eleven LLMs demonstrate the effectiveness of PowerAtlas under realistic physical operating conditions, with consistent feasibility and cost gains across three open-weight backbones. Our code is publicly available at https://github.com/JAVA-Jiang/PowerAtlas.
Kaiwen Jiang, Siya Xu, Ziyue Zhu +3