cs.ROAug 27, 2026

Planning a Shared Modular Fixture Layout Across Robotic Disassembly Stages

Authors: Haohui Pan, Takuya Kiyokawa, Kensuke Harada

Organizations: Department of Systems Innovation, Graduate School of Engineering Science, The University of Osaka, 1-3 Machikaneyama, Toyonaka, Osaka, Japan · Industrial Cyber-physical Systems Research Center, The National Institute of Advanced Industrial Science and Technology (AIST), 2-3-26 Aomi, Koto-ku, Tokyo, Japan

Abstract

Stable support remains challenging in robotic disassembly of irregularly shaped products. As components are progressively removed, the available support surfaces, mass distribution, and task loads change throughout the process. A fixture layout designed for one workpiece state may therefore become infeasible at later stages, motivating unified support planning over the complete disassembly sequence. This paper presents a modular vacuum-based fixturing system that plans one shared support configuration for the complete disassembly sequence of a screwdriver or shaver, allowing each sequence to proceed without fixture reconfiguration. To search the mixed continuous--discrete layout space under repeated cross-stage evaluation, a denoising diffusion probabilistic model generates physics-informed initial configurations that are refined through Bayesian optimization. Robotic screw and component-removal experiments verified the disassembly feasibility of the planned layouts, while 11 directional-load tests quantified their stability. Comparisons between the measured operational loads and directional responses yielded mean empirical stability margins of 66.9% for the screwdriver and 81.6% for the shaver. These results demonstrate that a product-specific shared layout can provide stable support throughout the tested robotic disassembly sequence.

Figures & tables

Explore similar work

CardsList
  1. Component Influence-Driven Fastener Reduction for Robotic Disassemblability-Aware Design Simplification

    May 20, 2026Takuya Kiyokawa, Tomoki Ishikura, Shingo Hamada +2Robotic Manipulation

  2. WRAP: Fixtureless Wrench-aware Multi-Robot Assembly Planning

    Sep 24, 2026Valentin N. Hartmann, Huang Su, Yijiang Huang +1Multi-Robot Motion PlanningRobot Task Planning