cs.ROOct 15, 2026

Plans Are Not Executions: Adapting Frozen World-Model Planners to Controller-Induced Execution Shift

Authors: Danqi Zhao, Keyu Chen, Wenchao Sun, Minglei Huang, Jianhe Zhang, Yan Zhu, Hao Cheng, Zifan Cao, 

Organizations: School of Vehicle and Mobility, Tsinghua University, Beijing, China. · Shanghai Technical Center, DENSO (China) Investment Co., Ltd., Shanghai, China. · DENSO (China) Investment Co., Ltd., China.

Abstract

World-model planners evaluate candidate trajectories by predicting their future consequences, implicitly relying on the plan-to-motion relationship learned during training. At deployment, a different downstream controller may execute the same planned trajectory differently, creating a planning-execution gap between the frozen model's imagined future and actual execution. A natural remedy is to replace the planned trajectory with its predicted or observed execution. However, we find that better execution fidelity does not necessarily yield better decisions: directly substituting predicted execution trajectories yields only a 0.048 PDMS improvement across 10 unseen controller configurations, far smaller than the gain from our proposed adaptation. This suggests a semantic mismatch between a planned trajectory, which serves as a reference for downstream control, and an executed trajectory, which already describes the resulting post-controller motion. We introduce ExecutionBridge, which infers controller-specific execution characteristics from planned-executed trajectory pairs and uses them to adapt the native ego latent rollout while keeping the original planned trajectory unchanged. The planner, world model, and reward head remain frozen. On NAVSIM, ExecutionBridge consistently improves planning across unseen controller configurations and multiple frozen world-model planners, with substantially larger gains in challenging driving scenes where execution mismatch more strongly affects candidate evaluation.

Figures & tables

Explore similar work

CardsList
  1. Mind the Execution Gap: Action-Semantic Mismatch in World-Model Control

    Oct 5, 2026Shengtao Wen, Xiang Chen, Yu Tian +3World Model-Based PlanningAction-Conditioned World Models

  2. Adapt for Planning, Not just Prediction: Optimistic Test-Time World Model Adaptation

    Oct 26, 2026Akshay Mete, Dileep Kalathil, P. R. KumarTest-Time AdaptationWorld Model-Based Planning

  3. AdaReP:Adaptive Re-Planning under Model Mismatch for Neural World-Model Predictive Control

    Jun 22, 2026Yutian Cheng, Xiaojian Ma, Xianhao Wang +6World Model-Based PlanningWorld Models for Robotics