PACE: Research Proving Agent for Adaptive Conjecture Exploration
Organizations: Peking University · Nankai University · Fudan University
Abstract
Many mathematical research agents focus on solving problems with fixed statements. However, conjecture research, especially in applied mathematics, may require revising candidate questions or conclusions as investigation proceeds, coupling problem formulation with proof development. We present PACE, a research-proof agent that supports this process through a structured research loop that selects mathematical objectives and develops or challenges candidate mechanisms. The whole prover constructs proofs from these mechanisms, and an independent verifier checks them against the original target. Evidence-tracking memory stores assumptions and dependencies arising during research and marks evidence for revalidation when a candidate or condition changes. This memory supports task-specific context composition that keeps checked premises, exploratory material and unresolved obligations distinct. To evaluate proof construction and conjecture research, we introduce ResearchProofBench, an applied-mathematics benchmark focused on optimization, comprising 51 known-proof tasks with 331 hidden checkpoints under historical abstract access and six open-problem cases. The known-proof tasks assess reconstruction of published results, while the open-problem cases assess mathematical investigation and proof development. On the 51 known-proof tasks, PACE achieves an aggregate Proof Score of 75.16 and completes 20 proofs. In conjecture research, PACE develops conditional results, with its submissions receiving higher review scores than the compared baselines.
Figures & tables
| System | Plan subproblems | Refine conjectures | Record result conditions | Recheck support after revisions | Separate prompt composition |
|---|---|---|---|---|---|
| QED | — | — | — | ||
| Iteris | — | — | |||
| PACE |
| Input: original target , initial memory , investigation limit . | |
|---|---|
| Frame into subproblems and initialize with . | |
| for do | |
| Select objective and action from ; execute using to obtain . | |
| If is a complete candidate proof, have the auditor and mathematical reviewer assess it against and record their findings. | |
| Identify , and from the result, current support assessments and any review findings. | |
| . | |
| System | Proof Score | Weighted Obligation Completion (%) | CPR (%) |
|---|---|---|---|
| direct prompting | 59.25 | 41.02 | 21.57 |
| self-check prompting | 60.87 | 44.08 | 27.45 |
| QED | 62.22 | 41.49 | 17.65 |
| Rethlas | 67.33 | 49.37 | 31.37 |
| Iteris | 68.05 | 50.78 | 33.33 |
| PACE | 75.16 | 60.75 | 39.22 |
| ID | Submission | LLM | Human | Conclusion | Main gap or qualification |
|---|---|---|---|---|---|
| C1 | Direct Solving | 2 | 2 | Conditional smoothness reduction | Invalid refutations |
| Iterative Solving | 3 | 3 | Conditional upper-bound progress | Initial objective gap omitted | |
| PACE | 7 | 6 | Task-permitted conditional result | Local exposition gap | |
| C2 | Direct Solving | 2 | 1 | Sample normalization | Minimax proof absent |
| Iterative Solving | 2 | 2 | Source normalization | Minimax resolution absent | |
| PACE | 5 | 5 | Fixed-path span lower bound | Source certification missing |
| Variant | LLM score | Human score |
|---|---|---|
| Full system | 7 | 6 |
| Single-Pass Research–Proof | 3 | 3 |
| Fixed-prompt workflow | 6 | 5 |
| Predetermined research sequence | 6 | 4 |
| Proof critique and revision | 5 | 3 |
| Without the revision-triggered revalidation module | 3 | 2 |
| Access | Proof Score | Weighted Obligation Completion (%) | Complete Proof Rate (%) |
|---|---|---|---|
| No-web | 70.28 | 54.55 | 35.29 |
| Frozen clean-web | 75.16 | 60.75 | 39.22 |
| Live full-web | 80.82 | 68.90 | 56.86 |
Appendix figures & tables18 assets
Supplementary material from the paper’s appendix.
Appendix
| Cluster | Tasks | Main mathematical content |
|---|---|---|
| P01 | 1 | Recurrence comparison and nonasymptotic bounds |
| P02 | 2 | Regularized quasi-Newton complexity |
| P04 | 3 | Interpolation, stepsize sequences and sharpness |
| P06 | 2 | Exact-penalty subproblems and duality |
| P08 | 2 | Local subgradient geometry and smoothing |
| P10 | 4 | Primal–dual fixed points, identification and restart |
| Task | Source result | Difficulty | Checkpoints |
|---|---|---|---|
| P01-T01 | Theorem 1 | S2 | 6 |
| P02-T02 | Lemma 19 | S1 | 7 |
| P02-T03 | Theorem 22 | S2 | 7 |
| P04-T04 | Proposition 2.17 | S2 | 6 |
| P04-T05 | Lemma 4.3 | S2 | 6 |
| P04-T06 | Lemma 5.4 | S2 | 6 |
| Task | Source result | Difficulty | Checkpoints |
|---|---|---|---|
| P16-T01 | Proposition 7.1 | S2 | 6 |
| P16-T02 | Theorem 7.3 | S2 | 6 |
| P17-T01 | Theorem 3 | S2 | 6 |
| P17-T02 | Theorem 4 | S2 | 7 |
| P17-T03 | Lemma 3 | S1 | 6 |
| P18-T01 | Theorem 4 | S3 | 6 |
| Grade | Required mathematical evidence |
|---|---|
| 4 | A complete, correct derivation, including hypotheses, quantifiers, constants, signs, branches and theorem applicability; the reviewer need not supply a missing argument. |
| 3 | The derivation is correct apart from a minor local rigor gap. |
| 2 | Valid progress is present, but a necessary bridge remains unproved. |
| 1 | A relevant proof attempt contains a mathematical error or invalid argument. |
| 0 | No supporting derivation of the registered claim is supplied. |
| System | Reviewed tasks | Complete obligations | Weighted Obligation Completion (%) |
|---|---|---|---|
| direct prompting | 51/51 | 146/331 | 41.02 |
| self-check prompting | 51/51 | 155/331 | 44.08 |
| QED | 51/51 | 152/331 | 41.49 |
| Rethlas | 51/51 | 171/331 | 49.37 |
| Iteris | 51/51 | 178/331 | 50.78 |
| PACE | 51/51 | 206/331 | 60.75 |
| Available | Literal task, permitted assumptions, anonymized final proof and referenced proof bodies, hidden reference, registered claims, weights and dependencies |
|---|---|
| Excluded | System identity, internal acceptance labels, other submissions and other review judgments |
| Model output | Atomic grades, route classifications, mathematical explanations, gap records and supporting, contextual, or contradicting line references |
| Derived output | Effective grades, checkpoint points, additional deductions, Proof Score and weighted obligation completion |
| CPR decision | Target conclusion, admissible assumptions and a justified proof route, assessed from the mathematical explanations and gap records |
| Task | Direct Prompting | Self-Check Prompting | QED | Rethlas | Iteris |
|---|---|---|---|---|---|
| P01-T01 | |||||
| P02-T02 | |||||
| P02-T03 | |||||
| P04-T04 | |||||
| P04-T05 | |||||
| P04-T06 |
| Task | Direct Prompting | Self-Check Prompting | QED | Rethlas | Iteris |
|---|---|---|---|---|---|
| P17-T01 | |||||
| P17-T02 | |||||
| P17-T03 | |||||
| P18-T01 | |||||
| P18-T02 | |||||
| P19-T01 |
| Task | Proof Score | Weighted Obligation Completion (%) | Task | Proof Score | Weighted Obligation Completion (%) |
|---|---|---|---|---|---|
| P01-T01 | 100.00 | 100.00 | P17-T01 | 69.33 | 60.00 |
| P02-T02 | 100.00 | 100.00 | P17-T02 | 89.00 | 64.00 |
| P02-T03 | 98.33 | 90.00 | P17-T03 | 81.00 | 58.00 |
| P04-T04 | 69.00 | 38.00 | P18-T01 | 30.33 | 12.00 |
| P04-T05 | 100.00 | 100.00 | P18-T02 | 100.00 | 100.00 |
| P04-T06 | 6.00 | 0.00 | P19-T01 | 56.00 | 46.00 |
| System | Proof Score | Weighted Obligation Completion (%) | Complete Proof Rate (%) | |
|---|---|---|---|---|
| Direct Prompting | 11 | 66.70 | 55.09 | 4/11 (36.36) |
| Self-Check Prompting | 11 | 69.47 | 56.55 | 4/11 (36.36) |
| QED | 11 | 67.09 | 47.27 | 3/11 (27.27) |
| Rethlas | 11 | 67.29 | 49.09 | 3/11 (27.27) |
| Iteris | 11 | 79.08 | 68.36 | 6/11 (54.55) |
| PACE | 11 | 81.33 | 72.18 | 6/11 (54.55) |
| System | Proof Score | Weighted Obligation Completion (%) | Complete Proof Rate (%) | |
|---|---|---|---|---|
| Direct Prompting | 29 | 55.60 | 34.83 | 4/29 (13.79) |
| Self-Check Prompting | 29 | 57.34 | 37.86 | 6/29 (20.69) |
| QED | 29 | 56.38 | 32.55 | 2/29 (6.90) |
| Rethlas | 29 | 64.15 | 44.55 | 9/29 (31.03) |
| Iteris | 29 | 61.62 | 40.48 | 7/29 (24.14) |
| PACE | 29 | 72.89 | 55.79 | 9/29 (31.03) |
| System | Proof Score | Weighted Obligation Completion (%) | Complete Proof Rate (%) | |
|---|---|---|---|---|
| Direct Prompting | 11 | 61.44 | 43.27 | 3/11 (27.27) |
| Self-Check Prompting | 11 | 61.54 | 48.00 | 4/11 (36.36) |
| QED | 11 | 72.74 | 59.27 | 4/11 (36.36) |
| Rethlas | 11 | 75.76 | 62.36 | 4/11 (36.36) |
| Iteris | 11 | 73.97 | 60.36 | 4/11 (36.36) |
| PACE | 11 | 75.00 | 62.36 | 5/11 (45.45) |
| Aspect | YUAN [1984] | C6 construction |
|---|---|---|
| Regularity | Convex objective; positive-definite Hessian at the minimizer | Globally and strongly convex example in the task’s locally strongly convex class |
| Q-order | Adjacent-iterate Q-orders for arbitrarily large | Adjacent-iterate Q-order exactly one under Eq. ( 6 ) |
| Attainment | Infimum one obtained from a family of runs | One infinite run attains the infimum in each fixed dimension |
| Algorithm | Broyden-family updates, including BFGS, with perfect line searches | Hessian-form BFGS with global minimization on every search line |
| Dimension | Every fixed , by extension of the two-dimensional example | Every fixed , preserving BFGS and Q-order under a block lift |
| Object | Host checks or records | Model judgment |
|---|---|---|
| Dispatch | Roles, limits, input references | Objective and action selection |
| Revision | Content change, version, review reset | Mathematical meaning of change |
| Reuse | Sources and historical arguments | Applicability and valid inference |
| Review | Same target and current candidate | Scope and argument correctness |
| Component | Main responsibility | Output and authority |
|---|---|---|
| director | Select one next action and its inputs | Scheduling directive; no mathematical verdict |
| prompt composer | Organize a selected task and its mathematical inputs | Role-specific prompt; no scheduling decision or mathematical verdict |
| survey | Acquire and inspect permitted sources | Source records and applicability gaps |
| research framing | Organize the original request | Bounded work items and dependencies |
| RCI | Develop candidates and support | Candidate tasks, mechanisms, uncovered regions and refutations |
| planner | Develop or substantially revise a route | Dependencies and unresolved bridges |
| Task or class | Proof scope | Planned tokens (M) |
| Known-proof S1 | Local derivation, certificate, or short key lemma | 3.00 |
| Known-proof S2 | Single theorem with several connected proof steps | 5.00 |
| Known-proof S3 | Sharp bound, long dependency chain, or new construction | 8.00 |
| C1 | Composite optimization: regime analysis and upper/lower bounds | 20.00 |
| C2 | Finite-chain and statistical lower bounds; sample normalization | 8.00 |
| C3 | Tree aggregation, accelerated potential, and propagation bound | 6.00 |
| Method or case | Tokens (M) |
|---|---|
| C1: full system, ablations and baselines | |
| PACE | 18.46 |
| A1: Single-pass research–proof | 7.96 |
| A2: Fixed-prompt context organization | 14.69 |
| A3: Predetermined research sequence | 13.64 |
| A4: Proof critique and revision | 20.60 |