Capacity to run large language models is rented by the accelerator-hour, and their output is sold by the million tokens. Both goods now have published price indices, an over-the-counter forward has traded on one, compute futures are listed offshore, and CME and ICE have specified futures on rental indices that await the United States regulator. We ask what in these two markets can be hedged, by whom, and at what price. Three findings stand out. First, the price that exchange contracts settle on is not the price that drives operators' revenue. The contracts on CME and ICE reference published short-dated rental rates, while most revenue, and with it credit quality, comes from private multi-year contracts whose prices are largely undisclosed. Second, the token price and the rental rate are linked by an identity through throughput and margin, but they are different exposures, so a hedge on the rental rate does not hedge the cost of inference. Third, the demand for hedging already sits in credit agreements, as the years by which operators' debt outlives their contracted revenue. Filings cannot measure that gap, because debt is scheduled year by year while contracted revenue rarely is, and the one loan that prices it settles the risk by cash prepayment against a model only the parties see. We design a reverse convertible note through which leveraged operators could buy protection against falling rental rates. Its coupon depends steeply on the annualised volatility of the rental rate, which the two public indices put between about 5% and 89% according to how each is built and the horizon measured; across that range the fair one-year coupon runs from 4.1% to 31.4%.
Figures & tables
CME
ICE
Nodal
Architect AX
Product
GPU1, GPU2
HPR, BKL
Compute futures
Compute futures
Reference
Silicon Data
Ornn
Compute Desk
not disclosed
daily indices
index
daily indices
Accelerators
H100, B200
H100, B200
Hopper,
H100, H200,
Blackwell
B200, B300
Contract unit
730 acc.-hours
Hours in month
not disclosed
not disclosed
Table 1: Exchange contracts on compute, as at 19 November 2026. None settles on a token price, and none is an option.
Figure 1: The bridge identity, Equation ( 1 ), with the margin term μt(m) held fixed. Panel (a): one rental rate is consistent with many token prices, according to what throughput efficiency εt(m) does at the same time; both axes are expressed relative to today, so the crossing point is the present state. Panel (b): three routes to a lower token price, only the first of which a compute contract sees in full. Percentages are changes from today. Both panels are computed from Equation ( 1 ) rather than drawn.
Figure 2: Equation ( 1 ) on Ornn’s public indices, keyed by the date each publisher prints. Panel (a) runs from 23 June 2026; the token index, and therefore panels (b) and (c), from 23 August 2026. Thin dashed segments join the last value before and the first value after the 18 days on which no token value is held; they are drawn for legibility only and enter no statistic. Panel (c) divides the H100 rate by each laboratory’s token price and rebases to 100 on the mean of its first seven observations. It equals εt(m)/(1+μt(m)) only if that laboratory’s tokens were served on H100 capacity at the index rate, which is an assumption.
Figure 3: The cheapest list price at which a given score on Epoch’s Capabilities Index can be bought, by threshold, from four laboratories’ own price lists. Prices blend input and output three to one. Each line starts on the day the first model reaches its threshold, and steps when a cheaper qualifying model or a price change replaces the minimum. The labels are the thresholds.
Announced
Sponsor
Instrument
$bn
Pricing, rating
Collateral
Source
2024-05
CoreWeave
DDTL
7.50
SOFR+600/650;+1300bp
unspecified
issuer
2025-05
CoreWeave
unsecured notes
2.00
9.250% fixed
unsecured
issuer
2025-07
CoreWeave
DDTL
2.60
SOFR+400bp
all assets
issuer
2025-10
Meta
secured notes
27.30
6.581% fixed, A+
real estate
press
2026-02
Oracle
financing plan
50.00
IG
unsecured
issuer
2026-03
CoreWeave
DDTL
8.50
SOFR+225bp, A3
accelerators
issuer
Table 2: Financing raised against compute capacity and the facilities housing it. Face amounts are committed, not drawn. The source column says whether the face amount comes from the issuer’s own filing or announcement or from a press report. An announced financing plan is not a completed issue and is subtotalled separately; one that mixes debt with equity is shown with the collateral of its debt.
Figure 4: The transactions of Table 2 , built from the same records. Panel (a): face amount by transaction, coloured by what secures it; grey marks collateral we could not establish from a primary source, which is not the same as unsecured, and the hatched Oracle bar is an announced plan. Panel (b): the spread over SOFR for the facilities that record one, labelled by sponsor and by whether an agency had rated the facility. The May 2024 facility priced off a grid keyed to the credit of the contract each draw serves; the shaded bar spans its investment-grade tier, and its non-investment-grade tier, at 1,300 basis points, is off the scale.
FY2027
FY2028
FY2029
FY2030
FY2031
Thereafter
Debt maturing
16,591
196,648
290,798
295,689
4,194,954
312,000
Lease receipts
451,065
1,453,748
2,251,769
2,280,829
2,299,574
27,107,897
Shortfall
—
—
—
—
1,895,380
—
Table 3: Applied Digital: scheduled debt maturities against contracted lease receipts. The FY2031 shortfall is the only single-year shortfall provable from filings in our sample; the leases outlast the debt, so it is a refinancing need. Gross debt principal against gross lease receivables; refinancing and new contracts are ignored.
Figure 5: The worked example, moved off its base case. All four panels use the same forward rate, term and risk-free rate as the text, so the base case, strike at 80% of spot and volatility 60%, appears in each. Panel (a): the fair coupon of Equation ( 6 ) against the strike, for three volatilities. Panel (b): the same coupon against volatility, for three strikes; as volatility vanishes the coupon falls to its time-value term, the horizontal line. Panel (c): the redemption of Equation ( 4 ) plus the coupon, against owning the exposure outright; upside stops at par plus the coupon and downside does not stop. Panel (d): futures a dealer that has issued the notes must buy to offset the rate exposure of a $1 million issue, against the forward rate.