ProbeShare: Probing a Few, Sharing Across Many for Fast World-Model Planning
Organizations: Zhejiang University · Westlake University · Southwest Jiaotong University · Beijing Institute of Technology ·
Abstract
Visual planning with a frozen joint-embedding world model supports robotic reaching and object manipulation by evaluating candidate action sequences against an image goal before execution. Standard cross-entropy method (CEM) planners roll out every candidate independently through a billion-parameter predictor, even when nearby actions induce similar scene changes. This redundant computation grows with population size and search rounds, slowing closed-loop replanning. We observe that candidates within a planning step share an observation history and thus a common action-to-feature map. Based on this insight, we propose ProbeShare, which measures local responses with a few representative probes and reconstructs each candidate's feature grid through scene-conditioned, geometry-aware weighting. When promising candidates move beyond existing probe coverage, ProbeShare evaluates a new probe to rescore nearby candidates. Across four RoboCasa tasks, ProbeShare accelerates episode planning by 43.8--128.9 times over dense RoboJEPA and at least over competitive baselines, with greater mean goal progress in a matched-time comparison.
Figures & tables
| Acceleration baselines adapted to RoboJEPA | ||||||||
|---|---|---|---|---|---|---|---|---|
| Task | Metric | RoboJEPA [ 30 ] (arXiv 2026) | CostGrad [ 26 ] (NeurIPS 2026) | DDP-WM [ 27 ] (ICML 2026) | CompACT [ 11 ] (CVPR 2026) | Sparse Imagination [ 4 ] (ICLR 2026) | ProbeShare (Ours) | |
| Reach | Progress reward | 0.935 | 0.853 | 0.908 | 0.046 | 0.921 | 0.863 | |
| Next-step L1 | 0.145 | 0.261 | 0.166 | 0.370 | 0.159 | 0.172 | ||
| Plan time (s) | 1,402.1 | 1,080.0 | 840.0 | 554.9 | 978.8 | 14.4 | (97.4 ) | |
| Object Reach | Progress reward | 0.336 | 0.362 | 0.620 | 0.013 | 0.590 | 0.657 | |
| Next-step L1 | 0.224 | 0.309 | 0.218 | 0.394 | 0.221 | 0.205 | ||
| Closed-loop planning | Next-step prediction | |||||||
|---|---|---|---|---|---|---|---|---|
| Task score | Probe rollouts | Plan time (s) | L1 | |||||
| Task | Init only | Full | Init only | Full | Init only | Full | Init only | Full |
| Reach | 0.645 | 0.863 | 35.0 | 182.5 | 7.1 | 14.4 | 0.188 | 0.172 |
| Object Reach | 0.453 | 0.657 | 35.0 | 96.2 | 6.6 | 10.8 | 0.203 | 0.205 |
| Obstacle | 0.119 | 0.532 | 498.0 | 1,051.2 | 212.4 | 569.0 | 0.207 | 0.204 |
| Push | 4/4 | 4/4 | 498.0 | 920.2 | 197.1 | 535.4 | 0.198 | 0.133 |
| Candidate scoring against the dense predictor | ||
|---|---|---|
| Coefficients | Cost MAE | Spearman |
| Without learned similarity | 0.0218 | 0.541 |
| Without directional adjustment | 0.0245 | 0.584 |
| ProbeShare | 0.0219 | 0.615 |
| Closed-loop obstacle reaching | ||
| Coefficients | Reward | Plan time (s) |
World Model-Based Planning
World model-based planning uses models of how environments change to compare imagined actions and choose goal-directed behavior.
See all 330 papers