A hybrid Graph-based Machine Learning Model for predicting Delivery Times in Supply Chain Logistics

Authors: Mattia Volpato, Andrea Giuseppe Landella, Bruno Puzzolante

Organizations: Cefriel, Viale Sarca 226, 20126 Milan, Italy

Abstract

Global supply chains are increasingly vulnerable to disruptions arising from external events, such as natural disasters and geopolitical crises, and from internal operational inefficiencies, including supplier delays and bottlenecks in order shipping. This work, conducted within the Horizon Europe project M4ESTRO, introduces a hybrid modelling approach combining graph theory and machine learning to represent supply chain logistics operations, with a focus on predicting delays in inbound flows between industrial suppliers and manufacturing entities. The various stages of order fulfilment are modelled through a formal mathematical framework, by defining disruption indicators computed from both historical and real-time data drawn from heterogeneous sources, including traffic and weather conditions and supplier dispatch readiness. Building on a graph-based representation of the supply chain, stochastic methods based on Markov chains are applied to estimate delivery times, detect schedule deviations, quantify prediction uncertainty, and produce interpretable metrics to support operational decision-making. Within the M4ESTRO project, the proposed framework was applied to build a web application for real-time tracking of inbound logistics, and was validated in a use case with an industrial project partner. The web application successfully enabled early detection of logistics disruptions along the supply chain and provided stakeholders with the visibility needed to act before delays propagated. The underlying model proved effective as the basis of a resilient, data-driven logistics tracking system, aligned with the digital transformation objectives of industry and with Manufacturing-as-a-Service paradigms.

Figures & tables

Appendix figures & tables12 assets

Supplementary material from the paper’s appendix.

Appendix

Explore similar work

CardsList
  1. EAGLE: Edge-Aware Graph Learning for Proactive Delivery Delay Prediction in Smart Logistics Networks

    Apr 6, 2026Zhiming Xue, Menghao Huo, Yujue WangSupply Chain ManagementSpatiotemporal Forecasting

  2. Travel Time Prediction in Supply Chain Management Using Machine Learning

    Sep 5, 2026Balaji VenkateswaranSupply Chain Management

  3. Uncertainty-Aware Delivery Delay Duration Prediction via Multi-Task Deep Learning

    Feb 23, 2026Stefan Faulkner, Reza Zandehshahvar, Vahid Eghbal Akhlaghi +3Supply Chain ManagementMulti-Task Learning