Edge robots increasingly use large language models (LLMs) for complex tasks, demanding efficient inference alongside timely control. Limited memory capacity constrains model deployment, while repeated weight transfers during decoding compete with activations and KV cache for external bandwidth. Sequential generation of robot actions further delays decisions and periodic control on shared hardware. We present a hybrid memory architecture with heterogeneous scheduling to address these bottlenecks jointly. Banked ROM stores selected fixed weights and supplies a standard compute array through a dedicated datapath. LPDDR retains the remaining weights and mutable state, preserving model flexibility. Coordinated operand delivery and preemption at output slice boundaries accelerate inference while limiting interference with periodic control. A structured decision interface scores candidate phases in a single forward pass, avoiding sequential token generation for routine choices. Together, these mechanisms improve memory service, compute access, and decision execution for edge robotic workloads. Experiments with Qwen3-8B achieve a peak decode speedup of 1.56× and reduce P99 task response time by a factor of approximately 227.27×, while completing 100.00% of the tested grasping and transport tasks.
Figures & tables
Fig. 1: Edge robot execution architectures. (a) LPDDR-only storage and sequential decoding saturate off-chip bandwidth and stall shared control. (b) Full-model ROM incurs prohibitive die area and freezes base weights. (c) Our hybrid architecture streams fixed weights via banked ROM to an unmodified array while decoupling periodic actuation via a single-pass guarded interface.
Fig. 2: (a) Decode latency comparison between the analytical peak-bandwidth bound (ideal) [ 7 ] and cycle-level execution under a standard NPU stack (actual) [ 23 ] , showing up to a 3.58× latency gap.(b) Manipulation task completion rates across Qwen3 scales [ 25 , 16 ] in ManiSkill3 [ 26 ] versus projected full-model planar ROM area [ 21 , 22 ] , with an 858mm2 single-reticle reference limit. (ci) Dynamic task completion rates under normalized decision latency from single-pass phase scoring ( 1× ) to multi-token decoding ( 20× ). (cii) Periodic motor control deadline miss rates on a shared NPU across memory and scheduling modes.
Fig. 3: Schematic of the system architecture and hybrid memory datapath organization. (a) Inside the control loop, Jev scores predefined task phases in one forward pass, while a geometric guard modulates motor commands and filters asynchronous remote replies. (b) On the shared NPU, selected fixed weights stream from banked digital ROM through bounded staging directly into the systolic array, bypassing LPDDR queues and single-port SRAM partitions.
Fig. 4: NPU datapath schematic. Dedicated ROM staging and banked input SRAM feed the compute array in lockstep; output SRAM drains to LPDDR.
Fig. 5: Qwen3-8B latency across prefill (P) and seven decode stages (D1–D7). Each panel normalizes its reference to one: (a) EDF (LPDDR+ROM) versus EDF (LPDDR), (b) Ours versus EDF (LPDDR+ROM), and (c) Ours versus EDF (LPDDR). P+7D covers the displayed planning sequence.
Common hardware configuration
Compute array / clock
128×128 / 1 GHz
Total SRAM
8 MiB
LPDDR capacity
24 GiB
LPDDR peak bandwidth
102.40 GB/s
Weight precision
BF16
Prefill length
128 tokens
TABLE I: Qwen3-8B evaluation settings. P/D denotes prefill/decode. ROM is enabled only in EDF (LPDDR+ROM) and Ours; all schemes reserve the same operand-buffer resources.
Fig. 6: Qwen3-8B first-decode sensitivity, normalized to the EDF (LPDDR) reference of each comparison. Panels vary array size, SRAM, ROM banks, bank organization, capacity, delivery, buffers, and execution policy. In (f), 256/512/1024 are ROM peak GB/s. The 1024 point also enlarges interfaces and buffer reservation; the 5 GiB budget stores 3.38 GiB of selected weights.
Model
L
d
dFFN
Q/KV
Mistral-7B-Instruct-v0.3
32
4096
14336
32/8
Qwen2.5-7B-Instruct
28
3584
18944
28/4
Phi-3.5-mini-instruct
32
3072
8192
32/32
TABLE II: Additional BF16 model checkpoints. L , d , and dFFN denote layer count, hidden width, and MLP intermediate width; Q/KV denotes attention-head counts.
Fig. 7: Latency across five LLMs under matched hardware budgets: (a) prefill, (b) mean decode over D1–D2 for the four smaller LLMs and D1 for 27B, and (c) prefill plus decode, covering seven decode tokens for Qwen3-8B, two for the other smaller LLMs, and one for 27B. Each LLM is normalized to its EDF (LPDDR) baseline. Labels show the reduction of Ours. GeoMean summarizes the four smaller LLMs over their respective evaluation windows; the 27B result is shown separately.
Fig. 8: Task response time under EDF (LPDDR), EDF (LPDDR+ROM), and Ours. (a) Response time CDF with a 50 ms deadline. (b) Response time quantiles, each normalized to its EDF (LPDDR) value on a logarithmic axis. Labels show the reduction achieved by Ours.
Large language model inference scheduling allocates requests, batches, compute, and KV-cache memory to balance latency, throughput, and service-level objectives.
School of Computer Science and Technology, University of Science and Technology of China, Hefei, China · Suzhou Institute for Advanced Research, University of Science and Technology of China, Suzhou, China · IEIT SYSTEMS Co., Ltd., Beijing, China