MoMa-NMP: Scene-Scale Neural Motion Planning for Mobile Manipulators
Organizations: Carnegie Mellon University, Pittsburgh, PA, USA
Abstract
Mobile manipulators operating in homes and other complex environments must coordinate their base and arm over long horizons, navigating around obstacles, through narrow passages, and between constrained workspaces. Neural motion planners can provide fast closed-loop planning from partial observations, but scaling them to room-sized environments is difficult because generating high-quality training trajectories is itself a challenging motion-planning problem. To address this, we introduce MoMa-DemoSmith, a demonstration-generation pipeline that separates the problem into global path discovery for large complex scenes and local motion refinement for collision avoidance. This key separation enables the generation of millions of challenging whole-body trajectories across our procedurally generated scenes. We train MoMa-NMP on these demonstrations through behavior cloning (BC) followed by privileged on-policy distillation, achieving 87.0% success on our simulation benchmark and 77.5% across 80 trials in unseen real-world scenes. See video results at https://adamhkan.com/moma-nmp/.
Figures & tables
| Method | Success (%) | Comp. comp. success (%) | tables success (%) | World collision (%) |
|---|---|---|---|---|
| MoMa-NMP (BC only) | 64.8 | 56.6 | 60.4 | 34.1 |
| MoMa-NMP | 87.0 | 84.4 | 85.1 | 12.3 |
| With privileged scene and goal information: | ||||
| Geometric Fabrics | 17.2 | 10.4 | 10.4 | 81.9 |
| cuRobo | 46.9 | 45.6 | 48.3 | 0.0 |
| OMPL RRTConnect | 85.3 | 83.9 | 84.8 | 0.0 |
| Method | Collision-free goal success (%) | Goal reached (%) |
|---|---|---|
| M 2 Diffuser | 23.2 | 27.8 |
| MoMa-NMP | 76.0 | 87.3 |
| Action targets | BC success (%) | BC collision (%) | Teacher success (%) |
|---|---|---|---|
| Geometric Fabrics | 64.8 | 34.1 | 92.5 |
| cuRobo | 47.0 | 53.0 | 88.0 |
| Variant | Success (%) | Collision (%) |
|---|---|---|
| With delta-pose inputs | 64.8 | 34.1 |
| Without delta-pose inputs | 27.5 | 56.9 |
| Method | Successes | Trials | Success (%) |
|---|---|---|---|
| MoMa-NMP | 62 | 80 | 77.5 |
| cuRobo | 23 | 80 | 28.8 |
| RRTConnect | 17 | 80 | 21.3 |
| Training observations | Successes | Trials | Success (%) |
|---|---|---|---|
| Rendered depth + LiDAR | 35 | 44 | 79.5 |
| Complete point sample | 24 | 44 | 54.5 |
Appendix figures & tables12 assets
Supplementary material from the paper’s appendix.
Appendix
| Task and phase | Priority | Pull | Sharpness | Damping | Transition | Radius |
|---|---|---|---|---|---|---|
| Base , transit | 5 | 20 | 40 | 40 | 25 | 0.2 |
| Base , goal lock | 3 | 20 | 40 | 40 | 25 | 0.2 |
| Base yaw, transit | 3 | 20 | 40 | 25 | 10 | 0.3 |
| Base yaw, goal lock | 3 | 20 | 40 | 800 | 10 | 0.3 |
| Franka posture, transit | 0.5 | 100 | 40 | 200 | 10 | 0.2 |
| Franka posture, goal lock | 0.1 | 100 | 40 | 200 | 10 | 0.2 |
| Role | Configuration-space target | Goal lock | Integration |
|---|---|---|---|
| DemoSmith annotation | The next five cuRobo base-and-arm configurations, supplied sequentially. | Disabled. | ; one step per target. |
| On-policy teacher | The five configurations predicted by the frozen BC policy, corrected sequentially from the visited state. | Enabled. | control; two substeps. |
| Standalone baseline | The demonstration goal configuration until goal lock; the terminal phase uses the EEF pose goal. | Enabled. | control; two substeps. |
| Setting | Depth camera | 3D LiDAR |
|---|---|---|
| Raster dimensions | pixels | 512 polar bins 512 azimuth bins |
| Angular coverage | Horizontal ; vertical | Azimuth ; polar angle from local |
| Near/far clipping | – forward depth | – radial range |
| Occlusion processing | Nearest-depth splats expanded by two pixels in each direction ( footprint) | Nearest-range bins with foreground suppression over a two-bin neighborhood |
| Return noise | Independent Gaussian XYZ noise, | Independent Gaussian XYZ noise, |
| Component | Configuration |
|---|---|
| Point input | 12,288 points with XYZ and one binary feature |
| PointNet++ | 256 centers; radius ; 64 neighbors; local MLP |
| Point projection | , LayerNorm and LeakyReLU |
| State inputs | Joint token: 7D; four pose tokens: 9D each |
| State MLPs | , ReLU |
| Encoder input | 256 point tokens 5 state tokens |
| Setting | Behavior cloning | Privileged on-policy refinement |
|---|---|---|
| Supervision | Precomputed five-step Fabrics chunks from approximately 6.7 million DemoSmith trajectories. Invalid padded targets are masked. | Five-step chunks obtained by sequentially correcting the frozen BC policy’s predictions with Fabrics. Targets after an intervening collision or reset are masked. |
| Sampling / rollout | The first and last 20 trajectory states are sampled with twice the weight of intermediate states. | Continuous rollouts with initial demonstration phase sampled uniformly from ; environments reset independently after collision, goal dwell, stall, or timeout. |
| Batching | 512 samples per rank; one optimizer update per sampled batch. | 2,048 environments and a 2,048-sample batch per GPU. Eight RTX A6000 GPUs give 16,384 simultaneous environments. |
| Learning rate | ; 300-update linear warmup followed by cosine decay over the nominal -update schedule. | ; linear warmup over two rollout episodes, then held constant. |
| Rollout length | Not applicable. | 3,000 control steps per episode. A five-step action query is made every five environment steps, giving 600 queries and updates per episode. |
| Rollout controller | Not applicable. | Teacher-controlled for 10 episodes, linearly transitioned from teacher to student control for 10 episodes, and student-controlled thereafter, following an expert-to-learner transition [ 39 ] . The teacher and student are initialized from the same BC checkpoint, and the teacher remains frozen. |
| Step | Operation |
|---|---|
| 1 | Reset completed environments, then form the current partial observation. Predict the frozen BC and student five-target chunks without gradients. |
| 2 | Draw one teacher/student controller choice per environment using the training schedule. Save the rollout state for teacher lookahead. |
| 3 | Sequentially correct the five BC targets using Equation ( 29 ); record corrected configurations and collision/reset validity masks. Restore the saved state. |
| 4 | Execute the selected teacher or student chunk for five control steps. Reset environments on collision, sustained goal reach, stall, or timeout. After a reset, hold that environment at its reset configuration until the next query so that remaining targets from the old scene are not executed. |
| 5 | Using the observation and teacher labels saved before execution, take one AdamW update on Equation ( 30 ). Discard this query’s training batch and continue from the resulting rollout state. |
| Quantity | Distribution or construction |
|---|---|
| Single-table geometry | Footprint , with clutter and compartment geometry drawn from the asset library. |
| Arrangement family | Line with probability ; otherwise a circle, inward- or outward-facing with equal probability. |
| Line layout | One to three tables with consecutive spacing of . |
| Circular layout | Initially three to seven tables, with radius increasing with table count. Random table removal opens gaps while preserving the selected start and goal tables. |
| Layout variation | Perturb table positions, heights, and orientations to avoid fixed, perfectly regular layouts. |
| Additional pillar | Independently present near each table with probability . Height ; width ; formed from overlapping cuboids. |
| Planner | Processes | Success (%) | Accepted/s |
|---|---|---|---|
| cuRobo | 8 | 28.4 | |
| RRTConnect | 40 | 48.9 | |
| AIT* | 40 | 25.3 | |
| ABIT* | 40 | 26.8 | |
| BIT* | 40 | 24.7 | |
| Informed RRT* | 40 | 19.4 |
| Training trajectories | Success (%) | Collision (%) | Comp. comp. (%) | tables (%) |
|---|---|---|---|---|
| 1.88M | 48.5 | 51.3 | 38.5 | 42.8 |
| 6.66M | 64.8 | 34.1 | 56.6 | 60.4 |
| Planner | Goal condition | Budget (s) | Success (%) | Comp. comp. success (%) | tables success (%) | Mean successful planning time (s) |
|---|---|---|---|---|---|---|
| cuRobo | 8 privileged goals | 1 | 41.4 | 40.5 | 38.3 | 0.32 |
| cuRobo | 8 privileged goals | 3 | 44.6 | 43.2 | 45.5 | 0.44 |
| cuRobo | 8 privileged goals | 12 | 45.6 | 45.3 | 45.1 | 0.48 |
| cuRobo | 8 privileged goals | 30 | 45.5 | 45.1 | 45.8 | 0.51 |
| cuRobo | 8 privileged goals | 60 | 46.0 | 45.3 | 44.8 | 0.48 |
| cuRobo | 1 DemoSmith goal | 12 | 36.1 | 34.4 | 35.4 | 0.28 |
| Planner | 8 privileged joint goals | EEF goal + online IK |
|---|---|---|
| cuRobo | 45.6 | 48.2 |
| RRTConnect | 50.5 | 34.3 |
| Method | Oracle geometry (%) | Sensor geometry (%) |
|---|---|---|
| cuRobo | 36.2 | 6.5 |
| RRTConnect | 54.1 | 8.6 |
Motion Planning
Motion planning finds safe, feasible paths and trajectories for robots and vehicles amid geometric, dynamic, and task constraints.
See all 458 papers