Risk-Averse Online POMDP Planning via CVaR of the Immediate Cost with Performance Guarantees
Organizations: Faculty of Mathematics Technion – Israel Institute of Technology Haifa, Israel · Stephen B. Klein Faculty of Aerospace Engineering; Faculty of Data and Decision Sciences Technion – Israel Institute of Technology Haifa, Israel
Abstract
Online POMDP planners optimize the expected cumulative cost, which can mask dangerous states when the belief places significant mass on high-cost states. Existing risk-averse methods apply static or dynamic Conditional Value at Risk (CVaR) to the value function, capturing trajectory-level risk, but share two gaps: (i) by retaining the immediate cost as an expectation of a state-dependent cost over the belief, the risk within the belief is left unaddressed; and (ii) by modifying the value function, they require new tailored algorithms rather than reusing existing expectation-based planners. We instead apply CVaR to the immediate cost over the belief at each step, directly targeting per-step uncertainty about the current state. The standard expected cumulative return is retained as the objective, so the resulting problem has a standard MDP structure: any expectation-based POMDP planner can be made risk-sensitive by changing only the cost computation. We inherit finite-time guarantees for policy evaluation and sparse sampling---with estimation error independent of the risk level---and, as our central theoretical result, prove a finite-time bound on the gap between the particle belief MDP surrogate and the original POMDP, which together yield an end-to-end guarantee from the true POMDP value to the algorithmic estimate. In the risk-neutral limit, the formulation recovers standard expectation-based planning.
Figures & tables
| Environment | Planner | CVaR Cost Return | Danger Encounters | Goal Rate |
|---|---|---|---|---|
| LightDark | PFT-DPW | |||
| ICVaR-PFT-DPW | ||||
| CVaRCost-PFT-DPW | ||||
| POMCPOW | ||||
| ICVaR-POMCPOW | ||||
| CVaRCost-POMCPOW |
Appendix figures & tables4 assets
Supplementary material from the paper’s appendix.
Appendix
| Environment | Planner | CVaR Cost Return | Danger | Goal | ||
|---|---|---|---|---|---|---|
| LightDark | PFT-DPW | |||||
| ICVaR-PFT-DPW | ||||||
| CVaRCost-PFT-DPW | ||||||
| POMCPOW | ||||||
| ICVaR-POMCPOW | ||||||
| CVaRCost-POMCPOW |
| Environment | Planner | Depth | Expl. Const. | ||||
|---|---|---|---|---|---|---|---|
| LightDark | PFT-DPW | 2 | 9534.9 | 1 | 0.28 | 6 | 0.49 |
| CVaRCost-PFT-DPW | 2 | 650.3 | 10 | 0.50 | 10 | 0.22 | |
| ICVaR-PFT-DPW | 2 | 9657.0 | 6 | 0.01 | 1 | 0.19 | |
| POMCPOW | 15 | 8000.9 | 6 | 0.35 | 6 | 0.36 | |
| CVaRCost-POMCPOW | 2 | 11595.5 | 4 | 0.48 | 7 | 0.46 | |
| ICVaR-POMCPOW | 3 | 5659.7 | 10 | 0.39 | 1 | 0.19 |