eess.SYNov 10, 2026

Decision-Focused Learning via Neural Optimization Layers for Battery-Assisted Grid-Import Smoothing in AI Data Centers

Authors: Xinda Zheng, Canchen Jiang, Frits de Nijs, Edward Lam, Markus Wagner

Organizations: Department of Data Science and AI, Faculty of Information Technology, Monash University, Australia

Abstract

Rapid AI data-center power fluctuations challenge grid integration. Sustained grid-import smoothing requires allocating limited battery power and energy under uncertain demand. We formulate risk-aware BESS scheduling that coordinates advance reserve commitments and demand-responsive dispatch, accounting for operating costs, grid-ramp penalties, and their conditional value-at-risk. We develop battery scheduling decision-focused learning (BS-DFL) with a constraint-aware neural optimization layer trained directly from this objective without optimal-solution labels. The trained layer is then frozen to guide demand-predictor learning through scheduling costs and ramping risk, enabling solver-free rolling-horizon scheduling. In a 10,000-minute simulation using loads derived from measured AI workloads, BS-DFL reduces mean absolute minute-to-minute grid-import changes by 71.70% and total scheduling cost by 18.01% relative to an MSE-trained predictor coupled with a mixed-integer linear programming solver, with an average decision time of 18.77 ms.

Figures & tables

Explore similar work

Jun 23, 2026

Power-Flexible AI Data Centers: A New Paradigm for Grid-Responsive Compute

The rapid expansion of artificial intelligence (AI) infrastructure is driving unprecedented growth in electricity demand from data centers. Traditional power-system planning treats large computing facilities as inflexible peak loads, leading to costly infrastructure upgrades and long delays in grid interconnection. Recent work has shown that AI clusters can reduce electricity consumption during peak demand through software-based workload orchestration. This article explores how modern GPU-based AI data centers can operate as grid-interactive assets that respond dynamically to power system conditions. We describe an architecture integrating grid signals, workload scheduling, and power telemetry for fine-grained cluster power control. Experimental results from a real-world deployment on a 130 kW GPU cluster demonstrate multiple forms of flexibility, including rapid load reduction, sustained curtailment, and carbon-aware operation while preserving service levels for priority jobs. We further demonstrate performance-aware load shifting across geographically distributed clusters, enabling workloads to migrate toward regions with lower grid stress. Together, these capabilities transform AI infrastructure from static electricity consumers into flexible resources that support grid reliability, accelerate interconnection, and improve computing sustainability.
Jul 29, 2026

PowerAtlas: Feasibility-Aware Language Models for Electricity-Computing Co-Scheduling

Electricity-computing co-scheduling (ECCS) decides where and when computing tasks run together with how generators are dispatched, because task placement changes nodal demand while power availability determines whether tasks can be served. Prior work addresses such coupled problems with optimization or learned controllers, and large language models (LLMs) are increasingly used to generate structured decisions for scheduling and power systems. Solver runtimes vary across instances, and LLM outputs that parse correctly can still violate grid and service constraints. We formalize ECCS as a structured decision task and release ECBench, 2,000 instances with Gurobi-optimal reference schedules and executable checks for grid limits, task service, cost, and latency. We propose PowerAtlas, which trains an LLM with supervised initialization and Feasibility-Aware GRPO on deterministic scorer feedback, and generates the joint schedule in a single response without solver calls or retrieval. On 10-40 paired instances per backbone, selected PowerAtlas checkpoints lower violations by 89-98% and penalized cost by up to 26x relative to base models, with residual supply deficits. Code and data are available at https://github.com/JAVA-Jiang/PowerAtlas.
May 6, 2026

OpenG2G: A Simulation Platform for AI Datacenter-Grid Runtime Coordination

AI's growing compute demand and new datacenter buildouts present major capacity and reliability challenges for the electricity grid, leading to multi-year interconnection delays for new datacenters and bottlenecking AI growth. To ease this strain, datacenters increasingly offer rapid power flexibility in response to grid signals, where the datacenter can increase or decrease its power consumption by adapting its workload in real time. In order to understand the impact of large datacenters on the grid and to facilitate the design of effective coordination strategies, we build OpenG2G, a simulation platform for AI datacenter-grid runtime coordination. We show that OpenG2G is capable of answering a wide range of coordination questions by allowing users to implement and compare various control paradigms (including classic, optimization, and learning-based controllers), and quantify how AI model and deployment choices affect datacenter flexibility and coordination outcomes. This versatility is enabled by OpenG2G's modular and extensible architecture: a datacenter backend driven by real measurements of production-grade AI services, a grid backend built on high-fidelity grid simulators, and a generic controller interface that closes the loop between them. We describe the design of OpenG2G and demonstrate its usefulness through realistic grid scenarios and AI workloads.