LiveGeo: Benchmarking Geographic Agents in Continuously Evolving Worlds
Organizations: National University of Singapore · Zhejiang University · Beijing University of Posts and Telecommunications · University of Oxford
Abstract
We introduce GeoWorld, a controllable and continuously evolving geographic environment platform for LLM agents, and LiveGeo, a benchmark for evaluating reliable decision-making in real-world geographic environments using GeoWorld. Unlike existing evaluations that largely reason and plan over fixed geographic states, GeoWorld is grounded in real-world geographic structure and allows external world states to evolve along their own temporal processes while preserving verifiable state histories. LiveGeo places geographic tasks within this evolving environment, requiring agents to actively acquire task-relevant information, verify whether the evidence supporting prior decisions remains valid, and revise their plans when necessary. Our results reveal that even frontier LLMs struggle with static tasks, with no model consistently excelling across tasks, while strong static performance does not ensure dynamic reliability. Further analysis identifies a key bottleneck: agents struggle to acquire and translate relevant evidence into valid decisions and maintain their correctness as the world evolves. By releasing LiveGeo together with its GeoWorld platform, we aim to provide the community with a flexible and extensible infrastructure for studying the next generation of agents capable of reliable action in evolving geographic worlds.
Figures & tables
| Evaluation dimension | MapEval ( 2025 ) | CityBench ( 2025b ) | USTBench ( 2026 ) | Travel Planner ( 2024 ) | Travel Bench ( 2026b ) | Mobility Bench ( 2026 ) | TripTide ( 2026 ) | LiveGeo (ours) |
| Geographic decision capabilities | ||||||||
| Geo understanding | ✓ | ✓ | ✓ | – | – | – | – | ✔ |
| Geo feasibility | – | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✔ |
| Decision grounding | – | – | – | – | – | ✓ | – | ✔ |
| Reliability as the world evolves | ||||||||
| Disruption adaptation | – | – | – | – | – | – | ✓ | ✔ |
| Task category | Decision dependency | Illustrative request |
| Atomic Geo Tasks — Establish local validity | ||
| Grounding | Evidence to entity. Resolve visual or textual clues to the exact requested place. | Identify the South Bank cinema from street-view clues near Hayward Gallery. |
| Discovery | Intent to destination. Select places satisfying joint spatial, service, and preference constraints. | Find a quiet vegetarian café within a 10-minute walk of Oxford Street that accepts reservations. |
| Mobility Planning | Journey feasibility. Satisfy waypoints, dwell times, travel modes, and deadlines. | Stop at The Vineyard for 20 minutes and reach the final destination within 65 minutes total. |
| Compositional Geo Tasks — Compose jointly valid decisions | ||
| Multi-Entity | Across participants. Find a common solution under individual location and availability constraints. | Arrange dinner for three people with different origins and departure times, sharing at least 60 minutes before 20:30. |
| Atomic Geo Tasks | Compositional Geo Tasks | Dynamic Evaluation | ||||||||
| Model | Grounding | Discovery | Mobility | Multi-Entity | Long-Horizon | Safety | Region | Static | Shared | Task-Only |
| GPT-5.6 Sol | 31.1 4.0 | 26.9 3.4 | 31.4 3.5 | 35.2 3.6 | 2.0 1.1 | 7.4 2.4 | 12.3 2.6 | 18.1 3.2 | 1.3 0.9 | 2.7 1.3 |
| Claude Opus 5 | 26.5 3.8 | 26.3 3.4 | 26.3 3.3 | 36.9 3.6 | 1.3 0.9 | 17.4 3.4 | 24.5 3.4 | 21.5 3.4 | 1.3 0.9 | 4.7 1.7 |
| Claude Sonnet 5 | 26.5 3.8 | 25.7 3.3 | 25.1 3.3 | 36.4 3.6 | 0.0 0.0 | 19.8 3.6 | 23.9 3.3 | 22.8 3.4 | 2.0 1.2 | 2.7 1.3 |
| Gemini 3.1 Pro Preview | 22.0 3.6 | 30.4 3.5 | 21.1 3.1 | 33.5 3.6 | 8.7 2.3 | 15.7 3.3 | 27.0 3.5 | 21.5 3.4 | 3.4 1.5 | 6.0 2.0 |
| Gemini 3.7 Flash | 37.1 4.2 | 38.0 3.7 | 19.4 3.0 | 42.6 3.7 | 8.7 2.3 | 17.4 3.4 | 27.6 3.5 | 26.2 3.6 | 13.4 2.8 | 14.1 2.9 |
Appendix figures & tables39 assets
Supplementary material from the paper’s appendix.
Appendix
| City | Regions | POIs | Cached routes |
| Shanghai | 8 | 290 | 21,357 |
| Tokyo | 28 | 238 | 7,404 |
| Singapore | 12 | 200 | 11,209 |
| London | 16 | 212 | 23,267 |
| New York | 12 | 216 | 7,295 |
| Cape Town | 12 | 220 | 36,840 |
| Task group | Task category | Retained instances | Review pass |
| Atomic Geo Tasks | Grounding | 132 | 96.4% |
| Discovery | 171 | 89.5% | |
| Mobility Planning | 175 | 92.6% | |
| Compositional Geo Tasks | Multi-Entity | 176 | 88.0% |
| Long-Horizon | 150 | 91.5% | |
| Safety-Aware | 121 | 98.4% |
| Task category | GT selection | Example GT |
| Grounding | Sample a target POI from GeoWorld. | Hackett London – Regent Street (London). |
| Discovery | Sample a target POI from GeoWorld. | Bread Street Kitchen & Bar (London). |
| Mobility Planning | Compute a Boolean GT using route facts and a solver. | True (feasible journey, London). |
| Multi-Entity | Sample a POI as the shared activity location. | Shinjuku Takashimaya (Tokyo). |
| Long-Horizon | Use an LLM to suggest activity types and code to select real POIs in sequence. | Tokyo Skytree Town Shinjuku Takashimaya Onigiri Bongo (partial). |
| Safety-Aware | Set the task time and sample an open POI. | President Hotel (London). |
| Task category | Verification criteria | Supporting evidence |
| Grounding | Check whether the image, clues, and target location are consistent and publicly identifiable. | Image-source records, landmarks, and retrieval evidence. |
| Discovery | Verify that the GT satisfies and is distinguished from other candidates within the defined comparison set. | Candidate-constraint satisfaction records and fact sources. |
| Mobility Planning | Determine whether a complete journey satisfies all travel requirements, or establish infeasibility. | Route records, feasible route chains, or supported infeasibility reasons. |
| Multi-Entity | Verify that all participants can reach the location and complete the shared activity within their time windows. | Individual routes, arrival times, and shared activity windows. |
| Long-Horizon | Check individual activity requirements and the feasibility of the complete itinerary. | Activity matching, travel times, schedules, and reference arrangements. |
| Safety-Aware | Verify that retains competing candidates, while together with identifies the GT. | Risk effects, spatial and temporal relations, and candidate outcomes. |
| Indicator | Criterion | What it measures |
| Tool-grounded | (i) The agent invokes the location-selection tool; (ii) the selected location is correct. | Whether the agent correctly selects the target location through tool interaction. |
| User-facing | (i) The agent submits a final response; (ii) the response contains the correct place name. | Whether the correct location is explicitly communicated to the user. |
| Indicator | Criterion | What it measures |
| Correctness | (i) The agent submits a final selection containing a place name and coordinates; (ii) both match the same entry in the acceptable-answer set. | Whether the agent ultimately recommends an acceptable destination. |
| Indicator | Criterion | What it measures |
| Feasibility consistency | The submitted Boolean feasibility judgment matches the private ground truth. | Whether the agent correctly determines whether the requested trip is feasible. |
| Route structure | The submitted route starts at the required origin, ends at the required destination, and forms a connected sequence of supported route legs. | Whether the selected legs form a valid journey. |
| Waypoint coverage | All required intermediate places are visited in the specified order. | Whether the journey includes the required stops in the correct sequence. |
| Mode compliance | No selected route leg uses a prohibited transport mode. | Whether the journey respects the user’s transport restrictions. |
| Time compliance | Travel time plus required stop durations does not exceed the specified time budget. | Whether the journey fits within the available time. |
| Walking compliance | The cumulative walking distance does not exceed the specified limit. | Whether the journey respects the user’s walking allowance. |
| Indicator | Criterion | What it measures |
| Place selection | The submitted place matches the private target by name and, when provided, coordinates. | Whether the agent selects the correct shared destination. |
| Feasibility consistency | The submitted feasibility judgment agrees with the private ground truth. | Whether the agent correctly determines whether a shared plan is feasible. |
| Budget compliance | The selected place’s per-person price does not exceed the specified budget. | Whether the destination respects the group’s budget constraint. |
| Dietary compatibility | The selected place accommodates all specified dietary requirements. | Whether the destination satisfies the group’s dietary needs. |
| Time-window compliance | The submitted meeting interval lies within the shared availability window. | Whether the proposed meeting time fits the participants’ common availability. |
| Notification completeness | The recorded messaging actions collectively include all required participants. | Whether every participant is included in the communication. |
| Indicator | Criterion | What it measures |
| Itinerary correctness | (i) A valid final submission with the correct feasibility judgment; (ii) complete daily selections with the required number and order of activities, where each selected place is uniquely identified by its name and coordinates; (iii) the complete itinerary matches a saved acceptable itinerary. | Whether the selected places form a complete and acceptable ordered itinerary across multiple days. |
| Indicator | Criterion | What it measures |
| Place correctness | The submitted place name and coordinates uniquely identify the target destination in the task world. | Whether the agent selects the correct destination. |
| Constraint compliance | The selected destination passes all applicable task and safety constraints, including event-adjusted availability and travel-time conditions. | Whether the destination satisfies the user’s requirements under the relevant safety conditions. |
| Evidence grounding | (i) The agent obtains all required safety notices through the designated Apps; (ii) reports their complete descriptions verbatim; (iii) provides no safety information unsupported by recorded tool responses. | Whether the recommendation is grounded in safety evidence actually obtained and faithfully reported by the agent. |
| Indicator | Criterion | What it measures |
| Contextual choice correctness | (i) The agent submits feasible: true and a final destination identified by its name and coordinates; (ii) the selected destination matches an entry in the private acceptable-answer set. | Whether the selected destination satisfies both the user’s requirements and the relevant regional context. |
| Indicator | Criterion |
| Event grounding | The agent observes all required task events after the initial checkpoint and faithfully reports their complete public messages using evidence obtained through tool interactions. |
| Replanning | The agent’s final decision matches the verified post-event reference answer for the updated world state. |
| Task category | Shanghai | Tokyo | Singapore | London | New York | Cape Town | Total |
| Grounding | 21 | 18 | 40 | 20 | 10 | 23 | 132 |
| Discovery | 42 | 27 | 26 | 28 | 18 | 30 | 171 |
| Mobility Planning | 30 | 26 | 30 | 30 | 30 | 29 | 175 |
| Multi-Entity | 30 | 30 | 30 | 27 | 29 | 30 | 176 |
| Long-Horizon | 30 | 6 | 26 | 18 | 19 | 51 | 150 |
| Safety-Aware | 8 | 3 | 16 | 27 | 20 | 47 | 121 |
| Task Category | Required Output |
| Grounding | Explicitly select a grounded location candidate before submitting the final answer. |
| Discovery | Report feasibility and explanation, together with the selected place and its geographic coordinates. |
| Mobility Planning | Report trip feasibility, selected route identifiers, transportation mode, and supporting explanation. |
| Multi-Entity | Provide the selected places and the required multi-entity coordination decisions. |
| Long-Horizon | Provide a day-wise itinerary with selected POIs and their activity order. |
| Safety-Aware | Provide the selected place and supporting safety information from observed messages. |
| Model | API Model ID | Interface |
| GPT-5.6 Sol | gpt-5.6 | Responses |
| Claude Opus 5 | claude-opus-5 | Chat |
| Claude Sonnet 5 | claude-sonnet-5 | Chat |
| Gemini 3.1 Pro Preview | gemini-3.1-pro-preview | Chat |
| Gemini 3.7 Flash | gemini-3.7-flash | Chat |
| Grok 4.5 | grok-4.5 | Chat |
| Category | Explanation |
| Static Settings | |
| Landmark Bias | Prefers prominent landmarks over candidates better supported by task evidence. |
| Spatial Reasoning Failure | Makes incorrect inferences about distance, direction, region, connectivity, or reachability. |
| Visual Perception Failure | Misinterprets visual features or associates image evidence with the wrong geographic entity. |
| Intent-to-Search Failure | Translates user requirements into inappropriate search, filtering, or verification conditions. |
| Discriminative Verification Failure | Misses or misapplies decisive checks needed to distinguish between candidate alternatives. |
| Class | Subtype | Example event |
| Qualitative | Place availability | The selected restaurant temporarily closes for maintenance. |
| Safety conditions | A new safety notice identifies the planned activity area as unsafe. | |
| Activity / place type | The user requests a museum instead of a shopping mall. | |
| Area requirements | The user changes the requested area from downtown to the waterfront. | |
| Dietary requirements | A participant now requires vegetarian food. | |
| Service requirements | The user adds a requirement for wheelchair access. |