Coding agents can construct and revise robot behavior during execution, but using one agent for the whole robot can delay otherwise independent work. We introduce Asynchronous Coding Agents as Policy (ACAP), an asynchronous framework that organizes one robot as a team of persistent agents. Each member reasons and acts for a configurable control group, such as an arm with its gripper or the torso and chassis, enabling asynchronous reasoning and execution. However, different robot components often have physical dependencies that require coordination. To address this challenge, ACAP introduces a hyper-agent that assigns tasks, coordinates dependencies, and dynamically allocates control between the lead and member agents. This allows independent work to progress concurrently while supporting tightly coupled manipulation when necessary. Across 72 real-world rollouts covering 25 task/platform settings, ACAP reduces task-balanced time cost by 28.2% compared with a single-agent Direct Policy, with improvements across Fully Parallel, Parallel-Sequential, and Collaborative tasks. Across all eight Collaborative settings, ACAP also achieves lower mean time cost than Fixed Delegation, where only member agents can control their assigned groups. An additional 90-rollout study shows lower mean 30-minute-capped time cost than Direct on all six tasks. We further demonstrate mobile manipulation using the same member interface for chassis and torso control. We present the framework and a real-world rollout dataset containing observations, generated programs, actions, and feedback to support research on how coding agents reason and act in the physical world.
Figures & tables
Figure 1: Asynchronous reasoning with agent-directed coordination. Left: Schematic timelines show parallel preparation with ordered vase access, and lead takeover followed by delegated finishing for towel folding. Top right: Mean physical progress and time cost across six tasks, with five trials per policy. Bottom right: Task-level time comparisons between Direct and ACAP in the task-coverage and repeated-trial studies.
Figure 2: Independent policy loops with agentic coordination. (a) Member agents serve configurable control groups, illustrated by two arms with grippers and a body group comprising the torso and chassis. (b) The hyper-agent policy πH uses history hk and member reports to assign or revise work, authorize access, or arrange direct lead execution of coupled actions. Each member follows an independent observe–reason–code–execute loop. The ownership check ωk(c) permits only the current owner to command group c . (c) Persistent contexts, message buffers, event-based waits and exclusive ownership support asynchronous progress and coordinated control handoffs.
Elapsed time (min) ↓
Progress AUC ↑
Task dependency
Direct
ACAP
Direct
ACAP
Fully Parallel (6)
20.49
13.22
60.3
75.2
Parallel-Sequential (11)
20.27
13.86
67.4
73.1
Collaborative (8)
16.25
13.75
56.9
70.8
All settings (25)
19.04
13.67
62.3
72.9
Table 1: Asynchronous framework versus Direct. Comparison across 25 task/platform settings. Time is task-balanced mean elapsed time in minutes, with a 30-minute minimum for noncompletion. Human annotators assess physical progress. AUC averages physical progress over 30 minutes (0–100), rewarding earlier progress. Bold marks the lowest time and highest AUC.
Figure 3: Visible progress with Direct and ACAP. Three cases cover Fully Parallel and Parallel-Sequential tasks across Galaxea R1 Pro and two AgileX PiPER installations. Columns share elapsed times within each task. Row labels give observed episode durations, and ended marks repeated final images.
Policy
Elapsed time (min) ↓
Progress AUC ↑
Direct
16.25
56.9
Fixed Delegation
26.02
36.3
ACAP
13.75
70.8
Table 2: Agentic coordination versus fixed delegation. Results averaged across eight Collaborative settings, reusing their Direct/ ACAP episodes from Table 1 . Fixed and ACAP share agent configurations, with Direct included as a reference. Time, AUC and bold text follow Table 1 .
Figure 4: Coordination on Collaborative tasks. ACAP uses direct lead execution for towel folding and complementary member roles for bottle opening. Columns share elapsed times. Failed denotes task noncompletion. Both bottle baselines trigger hardware faults after arm crossing. Later Fixed columns repeat its last available image.
Direct
Fixed Delegation
ACAP
Task
Time ↓
AUC ↑
Time ↓
AUC ↑
Time ↓
AUC ↑
Fully Parallel
Wipe and arrange towels
23.73 ± 3.84
60.5
15.16 ± 2.98
72.0
12.54 ± 1.95
73.7
Sort cubes and batteries
21.61 ± 3.07
62.5
17.44 ± 9.45
65.8
14.30 ± 5.87
75.2
Parallel-Sequential
Insert four flowers
27.06 ± 3.79
46.7
25.59 ± 5.13
34.8
22.89 ± 6.78
56.6
Table 3: Repeated-trial efficiency and physical progress. Five trials per task and policy. Time is mean 30-minute-capped cost in minutes, with sample SD in smaller type. AUC uses the physical-progress definition in Table 1 . Bold marks the lowest mean time and highest AUC. The final row averages the six task means.
(a) Asynchrony gains
Timing term
Coverage
Repeated
Extra reasoning work
+4.95
+6.29
Reasoning overlap
−8.17
−9.51
Reasoning/execution overlap
−1.35
−1.44
Execution overlap
−0.18
−0.14
Elapsed-time difference
−4.80
−5.23
Table 4: Timing analysis of efficiency gains. Times are in minutes and exclude outcome penalties. (a) ACAP relative to Direct in both studies. (b) Fixed versus ACAP on repeated Collaborative tasks.
Appendix figures & tables15 assets
Supplementary material from the paper’s appendix.
Appendix
Elapsed time (min) ↓
Progress AUC ↑
ID
Task (platform)
Direct
ACAP
Direct
ACAP
Fully Parallel
T01
Batteries to plates (P-A)
18.81
12.31
61.6
74.3
T02
Batteries to boxes (P-C)
21.26
12.50
63.7
77.7
T03
Wipe and arrange towels (R1)
15.56
14.46
66.8
82.6
T04
Hotel tray preparation (R1)
38.17
19.17
25.5
56.7
Appendix
Table 5: Per-task asynchronous framework comparison. Direct versus ACAP across the 25 settings in the task-coverage study. We average repetitions within each task. Time is elapsed time in minutes, with a 30-minute minimum for noncompletion. AUC averages human-annotated physical progress over 30 minutes. The lowest time and highest AUC are marked in bold. Detailed task instructions are given in Section B.1 .
Elapsed time (min) ↓
Progress AUC ↑
Task
Direct
Fixed
ACAP
Direct
Fixed
ACAP
T18 Ordered towel fold
14.88
34.51
14.24
64.0
37.4
71.1
T19 Basket lift
9.94
22.70
13.01
77.9
46.4
73.1
T20 Shirt fold
8.02
8.77
6.40
73.3
72.1
77.4
T21 Bottle opening
30.00
30.00
28.76
8.5
9.4
38.4
T22 Fruit-basket lift
7.45
20.59
6.90
80.4
44.2
84.9
Appendix
Table 6: Per-task agentic coordination comparison. Results on the eight collaborative tasks in Table 5 . Time, AUC and bold text follow Table 5 . The final row averages the eight tasks.
Policy
Measure
5 min
10 min
15 min
20 min
25 min
30 min
Fully Parallel (6 settings)
Direct
Progress Pt
14.6
49.3
76.4
87.5
91.7
93.8
Completion Ct
0.0
0.0
27.8
66.7
83.3
83.3
ACAP
Progress Pt
29.2
81.3
93.8
100.0
100.0
100.0
Completion Ct
0.0
25.0
83.3
91.7
100.0
100.0
Parallel-Sequential (11 settings)
Appendix
Table 7: Physical progress and task completion at five-minute intervals. Pt is physical progress by time t (0–100). Ct is task completion by time t (%). Episodes are averaged within each task, then averaged equally across tasks. Bold marks the best within each group.
Figure 5: Time cost across repeated executions. Dots denote task completion within 30 minutes, and crosses denote incomplete tasks at 30 minutes. Horizontal bars show means. Each task and policy has five trials.
ID
Instruction
Fully Parallel
T01
Put the batteries into their nearest plates.
T02
Put the batteries into their nearest box.
T03
Clean up the dirty water with the blue towel. Put the clean white towel rolls into the tray.
T04
Put the two bottles of water into the tray, upright in the center, then put the rolled towels onto the tray, one on each side.
T05
Put the towel rolls into the tray, side by side.
Appendix
Table 8: Task instructions for all 25 settings, grouped by dependency category.
Task (platform)
Instruction
Wipe and arrange towels (R1)
Clean up the dirty water with the blue towel. Put the clean white towel rolls into the tray side by side.
Sort cubes and batteries (P-B)
Put the cubes into the plate, batteries into the cup.
Insert four flowers (P-A)
Insert the flowers into the vase.
Assemble a sandwich (P-D)
Insert one piece of lettuce between the two pieces of bread.
Fold a towel (P-B)
Fold the towel into a quarter square, from bottom to top, then from left to right.
Lift a milk carton (P-A)
Hold the milk brick in the air with both hands, showing a clear margin above the table.
Appendix
Table 9: Instructions in the repeated-trial study. The same instruction is used for all five trials of each policy on a task.
Figure 6: Physical-progress annotation interface. Camera frames, task-specific scoring criteria and timestamped marks are shown together with the episode’s progress curve. The selected frame shows three inserted flowers, corresponding to 75% progress.
Figure 7: Coordinating body and arm members. (a) An instantiation with three control groups, colored by member: left arm and gripper, right arm and gripper, and chassis and torso. (b) Combined member labels indicate complementary roles: body navigation with a retained right-hand grasp (3), torso planning during left-member acquisition (4), and body lowering while both arm members maintain their grasps (5). Images come from chassis- and head-mounted cameras.
Interaction
Timestamped evidence
Route planning during arm execution
08:45–09:13: The body agent plans the navigation route. Meanwhile, the right arm retracts with its flower during 08:49–08:58 and reports readiness for transport at 09:11.
Chassis movement during scene interpretation
09:37–09:55: The left agent reassesses the destination basket from newly available views. During this assessment, the body executes a backward chassis movement at 09:48–09:51. The left agent’s report subsequently informs the navigation direction.
Synchronization before torso movement
The right agent reports readiness at 15:39, and the left reports its flower retained after inward retraction at 16:48. After both reports, the lead authorizes the body agent to lower the torso at 17:05, with the arms holding their positions.
Concurrent work across all three members
20:46–21:02: The body agent plans chassis realignment, the right agent evaluates flower-placement poses, and the left arm physically retracts with its flower. All three members progress concurrently.
Body realignment followed by arm placement
The right agent reports completed placement and a stable empty arm at 27:02. The lead authorizes chassis realignment at 27:10. After the body reports completion at 28:36, the lead authorizes left-arm placement at 28:50, which the left agent reports completed at 32:02.
Appendix
Table 10: Asynchronous work and coordination in mobile manipulation. Selected interactions from the body-agent rollout. Times are elapsed mm:ss from episode start.
Figure 8: Geometric reasoning for action and feedback. (a) The robot raises the flower. The agent uses the measured hand displacement and two images to estimate the tip’s position, then aligns and inserts the stem. (b) The agent estimates basket placement and clearance from fitted surfaces and tracked motion, then adjusts both arms to lower and release the basket. (c) A fitted bottle axis determines a corrective wrist rotation, which is used in the next motion command before tray placement. (d) After a commanded 20 mm lift, tracked carton features indicate a rise of approximately 19 mm, correcting the lead’s initial slip diagnosis.
Figure 9: Fully Parallel tasks. Direct and ACAP perform battery placement, wiping and towel arrangement, towel-roll placement, and independent cube/battery sorting.
Figure 10: Parallel-Sequential tasks. Direct and ACAP perform pen placement on two installations, grid sorting, flower insertion and clothes collection.
Figure 11: Parallel-Sequential tasks (continued). Sponge-cube placement, cup stacking, toy-block collection, four-flower insertion and towel-pyramid construction. The towel-pyramid sequence has its own column times.
Figure 12: Collaborative tasks. Direct, Fixed and ACAP perform basket lifting on R1, shirt folding on P-C and fruit-basket lifting on P-A.
Figure 13: Collaborative tasks (continued). Milk-carton lifting, pot placement on a book and fruit-basket placement on a sponge. Direct and ACAP achieve task completion in all three settings. Fixed leaves the pot and basket tasks unfinished in these runs.