cs.DCMar 12, 2026

WORKSWORLD: A Domain for Integrated Numeric Planning and Scheduling of Distributed Pipelined Workflows

Authors: Taylor Paul, William Regli

Organizations: University of Maryland, College Park, MD USA

Abstract

This work pursues automated planning and scheduling of distributed data pipelines, or workflows. We develop a general workflow and resource graph representation that includes both data processing and sharing components with corresponding network interfaces for scheduling. Leveraging these graphs, we introduce WORKSWORLD, a new domain for numeric domain-independent planners designed for permanently scheduled workflows, like ingest pipelines. Our framework permits users to define data sources, available workflow components, and desired data destinations and formats without explicitly declaring the entire workflow graph as a goal. The planner solves a joint planning and scheduling problem, producing a plan that both builds the workflow graph and schedules its components on the resource graph. We empirically show that a state-of-the-art numeric planner running on commodity hardware with one hour of CPU time and 30GB of memory can solve linear-chain workflows of up to 14 components across eight sites.

Figures & tables

Explore similar work

Sep 14, 2026

Cloud Workflow Scheduling Based on Graph Attention-Driven Hierarchical Reinforcement Learning

Dynamic cloud workflow scheduling must balance deadline satisfaction, container utilization, and energy consumption while dealing with stochastic task-execution speeds, placement-dependent communication, and coupled task and container decisions. Workflows are naturally modeled as directed acyclic graphs (DAGs), but conventional vector- or matrix-based states do not fully capture their dependency topology. To better represent task urgency and structural relationships, we assign predicted sub-deadlines to tasks and use a multi-head graph attention network (GAT) to extract dependency information from the evolving DAGs. Based on these representations, we develop a Graph Attention-Driven Hierarchical Reinforcement Learning (GA-HRL) framework and model the scheduling process as an event-driven hierarchical semi-Markov decision process (SMDP). Workflow arrivals and task completions trigger scheduling events. At each scheduling event, the Task Scheduling (TS) agent first processes the currently ready tasks by assigning them to admissible existing containers or requesting new ones. The requested containers are then processed by the Container Scheduling (CS) agent for host placement before the environment advances. The two agents are trained alternately using separate Proximal Policy Optimization (PPO). Experiments on the 2018 Alibaba cluster trace show that GA-HRL maintains competitive workflow success rate and, in settings where success is comparable, generally achieves higher container utilization and lower energy consumption. Under the largest speed variation, it trades a small success-rate margin for substantially lower energy. Simulation code is available at: https://github.com/zongjin130/GA-HRL.
Sep 4, 2026

Planning and Scheduling Business Processes under Control-Flow Uncertainty: Extended Version

Scheduling activities in business processes can improve efficiency (e.g., reduce makespan), but is challenging because the exact sequence of activities required to complete a case is often uncertain due to decisions based on data that emerges during execution. Nevertheless, probabilistic information regarding such decisions can often be estimated or derived from historical execution logs, and can help anticipate which execution paths are likely to lead to successful completion. Planning with particular execution paths affects feasibility, i.e., the probability of successful completion, and the expected number of superfluous activities that are planned but never executed. We frame the problem as a chance-constrained optimization problem and present two formulations: A decomposed approach with two stages, a planning stage that minimizes the expected number of superfluous activities subject to a feasibility constraint, and a scheduling stage that minimizes the makespan over the planned activities; and an integrated approach that combines planning and scheduling into a single formulation. Evaluation on two real-world and one synthetic dataset shows that the integrated approach yields superior makespans but is intractable at scale, while the decomposed approach scales to large settings.
Mar 7, 2026

Duration-Informed Workload Scheduler

High-performance computing systems are complex machines whose behaviour is governed by the correct functioning of its many subsystems. Among these, the workload scheduler has a crucial impact on the timely execution of the jobs continuously submitted to the computing resources. Making high-quality scheduling decisions is contingent on knowing the duration of submitted jobs before their execution--a non-trivial task for users that can be tackled with Machine Learning. In this work, we devise a workload scheduler enhanced with a duration prediction module built via Machine Learning. We evaluate its effectiveness and show its performance using workload traces from a Tier-0 supercomputer, demonstrating a decrease in mean waiting time across all jobs of around 11%. Lower waiting times are directly connected to better quality of service from the users' point of view and higher turnaround from the system's perspective.