cs.ROOct 14, 2026

Feasibility Ceilings Before Learning: Sizing and Timing Bounds for Drone-Mesh Interception

Authors: Dmytro Babarytskyi

Organizations: Kharkiv National University of Radio Electronics Kharkiv, Ukraine

Abstract

A mesh of interceptors defending a fixed site must spread over the predicted arrival point of an approaching object. This is a recurring task in multi-agent robotics: N agents, each covering a disc of radius r, spread over a probability density so that a point drawn from it falls within some agent's disc. We give closed forms for the quantities that bound performance before any policy is chosen, and validate each by Monte Carlo. The uncertainty of a point predicted by extrapolating a noisy linear track follows from least-squares variance propagation plus a delta-method term for the uncertain arrival time, agreeing with simulation to within 1.8%. The coverage probability of a packed mesh admits a closed form accurate to 0.007 absolute, with a volumetric analogue. A naive area ratio misses a ceiling: while agents stay at least 2r apart, no mesh exceeds 90.69% coverage in the plane or 74.05% in a volume. This ceiling belongs to the separation constraint, not to the problem - permitting overlap substitutes Kershner's thinnest-covering density and removes it, the better regime above a crossover at p=0.80. Hexagonal packing is optimal among five arrangements; the centroidal-Voronoi configuration coverage control supplies reaches only half its coverage at small budgets. The Gaussian assumption is conservative under heavy tails and anisotropy but fragile under bias: a one-sigma aim-point offset costs 14 points of coverage. A repositioning team must also choose a commit time, and the admissible window can be empty. Against the applicable ceiling, analytic placement attains 85% of what the configuration permits while centralised PPO averages 15% over three trainer seeds, with a paired bootstrap against a null policy containing zero at every seed. We argue such ceilings should be computed before any learning experiment and quoted alongside every result.

Figures & tables

Explore similar work

May 20, 2026

Distributed Multi-Coverage for Robot Swarms

Autonomous drone swarms deployed for surveillance, environmental monitoring, and infrastructure inspection must maintain reliable coverage of critical assets despite robot failures. This requires multicoverage: each asset must be observed by multiple robots for redundancy, with coverage requirements varying by asset importance. While recent work has solved the centralized problem optimally using integer programming, practical deployments face constraints that demand distributed solutions: robots operate with limited communication ranges, onboard computation restricts global planning, and partial system failures must not cause mission abort. We present a distributed multicoverage algorithm for robot swarms operating with local sensing, local communication, and no global coordination.
Jul 20, 2026

Beyond Fixed Goal Delivery: Online POMDP Planning for Target Interception in Crowds

Target interception in crowded environments requires reaching a moving objective while navigating among multiple uncertain human agents. Since human navigation intent is not directly observable, the robot must reason over multiple possible future interaction outcomes. We formulate interception in crowds as a partially observable Markov decision process and solve it online using tree search under a fixed computational budget. In this setting, the action-space structure directly shapes the search tree and how computational effort is allocated. We perform a controlled comparison between a sequential path-speed planner, which first plans a spatial path and then modulates speed along it, and a unified planner that jointly branches over steering and speed within tree search. Across simulations with up to 200 humans, both approaches perform similarly at low crowd density but diverge sharply as density increases. At the highest crowd density, the sequential planner has a safe-interception rate 31 percentage points lower and requires 44% more time than the unified steering-speed planner, revealing a structural limitation of spatial restriction. Project webpage: https://tic-planning.github.io/
Apr 13, 2026

Dynamic Multi-Robot Task Allocation under Uncertainty and Communication Constraints: A Game-Theoretic Approach

We study dynamic multi-robot task allocation under uncertain task completion, time-window constraints, and incomplete information. Tasks arrive online over a finite horizon and must be completed within specified deadlines, while agents operate from distributed hubs with limited sensing and communication. We model incomplete information through hub-based sensing regions that determine task visibility and a communication graph that governs inter-hub information exchange. Using this framework, we propose Iterative Best Response (IBR), a decentralized policy in which each agent selects the task that maximizes its marginal contribution to the locally observed welfare. We compare IBR against three baselines: Earliest Due Date first (EDD), Hungarian algorithm, and Stochastic Conflict-Based Allocation (SCoBA), on a city-scale package-delivery domain with up to 100 drones and varying task arrival scenarios. Under full and sparse communication, IBR achieves competitive task-completion performance with lower computation time.