LASER: Level-Based Asynchronous Scheduling and Execution Regime for Spatiotemporally Constrained Multi-Robot Timber Manufacturing

Authors: Zhenxiang Huang, Lior Skoury, Tim Stark, Aaron Wagner, Hans Jakob Wagner, Thomas Wortmann, Achim Menges

Organizations: Institute for Computational Design and Construction (ICD) and Cluster of Excellence IntCDC at University of Stuttgart, Germany.

Abstract

Automating large-scale manufacturing in domains like timber construction requires multi-robot systems to manage tightly coupled spatiotemporal constraints, such as collision avoidance and process-driven deadlines. This paper introduces LASER (Level-based Asynchronous Scheduling and Execution Regime), a complete framework for scheduling and executing complex assembly tasks, demonstrated on a screw-press gluing application for timber slab manufacturing. Our central contribution is to integrate a barrier-based mechanism into a constraint programming (CP) scheduling formulation that partitions tasks into spatiotemporally disjoint sets, which we define as levels. This structure enables robots to execute tasks in parallel and asynchronously within a level, synchronizing only at level barriers, which guarantees collision-free operation by construction and provides robustness to timing uncertainties. To solve this formulation for large problems, we propose two specialized algorithms: an iterative temporal-relaxation approach for heterogeneous task sequences and a bi-level decomposition for homogeneous tasks that balances workload. We validate the LASER framework by fabricating a full-scale 2.4m x 6m timber slab with a two-robot system mounted on parallel linear tracks, successfully coordinating 108 subroutines and 352 screws under tight adhesive time windows. Computational studies show our method scales steadily with size compared to a monolithic approach.

Figures & tables

Explore similar work

Sep 21, 2026

CAST: Collision-Aware Assembly with Construction Robots using Simultaneous Trajectory Estimation and Planning

Multi-robot systems have shown increasing viability in construction due to their ability to execute high-precision actions while reducing human exposure to hazardous tasks. However, these environments have high-dimensional configuration spaces and possess substantial collision-avoidance constraints, which include other robots, assembly objects, and workspace boundaries. We utilize a single factor graph for trajectory estimation and planning that incorporates measured robot states together with explicit collision and learned cable constraints. This supports changing workspaces and enables synchronized, high-dimensional robot motion planning while accounting for the stiff, vibration-induced uncertainty of heavy robotic systems. We demonstrate the success of our framework on the construction of a post-and-lintel structure using one robot arm as a timber gripper, and a second robot as a nail-fastener.
Aug 6, 2026

Coordinated Multi-Robot Disassembly for Makespan Optimization of Large-Scale Assemblies

Multi-robot task and motion planning for disassembly tasks requires robots to operate in confined workspaces while coordinating their motions with other robots. To tackle this problem, we propose a planning method called coordinated multi-robot disassembly (CoMuDi). CoMuDi coordinates a team of robots for disassembly tasks. The input is a team of robots, an assembly of objects, and a dependency graph. Based on this information, we create compound tasks for pick, place, and exit motions. By propagating temporal constraints, we ensure that each robot can start and end their tasks as early as possible while avoiding collisions with nearby robots. By integrating the space-time RRT* planner (ST-RRT*) into CoMuDi, we ensure that individual tasks minimize arrival time and thereby help us minimize overall makespan. We compare the performance of CoMuDi using both ST-RRT* and RRT* planners with varying time bounds, demonstrating that the combination of CoMuDi and ST-RRT* leads to a higher success rate while minimizing makespan. Finally, we evaluate CoMuDi on six assemblies with up to 49 pieces and up to 9 robots. In those scenarios, we show that CoMuDi returns robot paths that exhibit low idle times, thereby demonstrating that CoMuDi can reliably solve large-scale assemblies.
Jun 13, 2026

OSDAG: Online Scheduling for Efficient Multi-Robot Collaboration

Coordinating heterogeneous multi-robot systems (MRS) for complex, long-horizon tasks requires both flexible high-level reasoning and efficient execution-time scheduling. Existing LLM-based approaches struggle to balance reasoning efficiency and execution flexibility. Flat sequential plans are efficient to generate but overlook parallel execution opportunities, while repeated LLM reasoning introduces high latency, and offline schedules may unnecessarily keep robots idle due to fixed execution orders. This paper presents OSDAG, a novel framework that resolves this trade-off by employing a Directed Acyclic Graph (DAG) as the central representation for multi-robot coordination, coupled with constraint-aware online scheduling. The LLM is typically invoked once as a semantic parser that decomposes a natural-language instruction into a dependency-annotated task graph encoding precedence relations, together with robot capability and resource-feasibility constraints. A lightweight online scheduler then dynamically dispatches dependency-ready tasks to their assigned robots as soon as they become idle, exposing available parallelism while preserving correctness. Experiments across five benchmark scenarios demonstrate that OSDAG achieves 5−15×5-15\times faster reasoning time than dialogue-based methods, reduces makespan by up to 38%38\% over sequential baselines, and maintains competitive success rates. Both simulation and real-world experiments on human-robot collaboration tasks validate the effectiveness and practicality of the proposed approach for efficient multi-robot coordination. The website and resources are available at http://thanhnguyencanh.github.io/LLM_DAG4MultiRobot