Integrated Multi-Drone Task Allocation, Sequencing, and Optimal Trajectory Generation in Obstacle-Rich 3D Environments
Organizations: Aerospace Engineering Department, Faculty of Aeronautics and Astronautics, Kocaeli University, Kocaeli, Turkiye · Interdisciplinary Research Center for Aviation and Space Exploration, KFUPM, Dhahran, Saudi Arabia · Mechanical Engineering Department, Faculty of Aeronautics and Astronautics, Kocaeli University, Kocaeli, Turkiye
Abstract
Coordinating teams of aerial robots in cluttered three-dimensional (3D) environments requires a principled integration of discrete mission planning-deciding which robot serves which goals and in what order -- with continuous-time trajectory synthesis that enforces collision avoidance and dynamic feasibility. This paper introduces IMD-TAPP (Integrated Multi-Drone Task Allocation and Path Planning), an end-to-end framework that jointly addresses multi-goal allocation, tour sequencing, and safe trajectory generation for quadrotor teams operating in obstacle-rich spaces. IMD--TAPP first discretizes the workspace into a 3D navigation graph and computes obstacle-aware robot-to-goal and goal-to-goal travel costs via graph-search-based pathfinding. These costs are then embedded within an Injected Particle Swarm Optimization (IPSO) scheme, guided by multiple linear assignment, to efficiently explore coupled assignment/ordering alternatives and to minimize mission makespan. Finally, the resulting waypoint tours are transformed into time-parameterized minimum-snap trajectories through a generation-and-optimization routine equipped with iterative validation of obstacle clearance and inter-robot separation, triggering re-planning when safety margins are violated. Extensive MATLAB simulations across cluttered 3D scenarios demonstrate that IMD--TAPP consistently produces dynamically feasible, collision-free trajectories while achieving competitive completion times. In a representative case study with two drones serving multiple goals, the proposed approach attains a minimum mission time of 136~s while maintaining the required safety constraints throughout execution.
Figures & tables
| Symbol | Meaning |
| number of robots (drones) | |
| number of goals | |
| ordered goal sequence assigned to robot | |
| travel cost computed from geometric paths | |
| optimal mission objective (makespan) | |
| position of robot over time |
| Item | Setting |
| Software | MATLAB R2023b |
| CPU | Intel Core i7-1065G7 @ 1.30 GHz |
| GPU | NVIDIA GeForce GTX 1650 (4 GB) |
| RAM | 16 GB |
| Robot model parameters | As in [ 3 ] |
| Environment | 3D workspace with obstacles (Figure 9 ) |