Semiconductor factories process many kinds of wafers organized into lots of various sizes and configurations. Different kinds of machines, each with its own operations, process wafers for hours to days, and the wafers undergo many incremental fabrication steps (with re-entry) and flows spanning days to weeks across connected machines. Fast and accurate predictions of throughput (TH) and turnaround time (TA) dynamics for individual machines and their combinations are essential for factory operations. To use machine learning methods for this purpose, this paper presents a Temporal Convolutional Network with Multi-head Attention (TCNA) architecture. It uses simulated datasets from a benchmark Parallel DEVS (PDEVS) semiconductor fabrication factory model. The factory processes configurable wafer lots with uniform and sinusoidal wafer arrival profiles and may undergo preventive maintenance. The wafer lot size, arrival profile, and factory maintenance policy are used as static covariates. TCNA is applied to a selected set of simulated discrete-event throughput and turnaround time trajectories. The TH and TA time series predicted by TCNA, evaluated with the common MAPE, MSE, and R2 measures, show comparable or higher accuracy relative to other model architectures, with similar parameter counts and epoch times; the TCNA model size and execution time are similar to those of other architectures such as the Temporal Fusion Transformer. Although time series predictions are less accurate than high-resolution simulations, they can be deployed at a much lower computational cost. The TCNA achieves orders-of-magnitude speedup over PDEVS simulation with an acceptable loss of accuracy, enabling frequent product scheduling, capacity planning, and maintenance planning.
Figures & tables
Figure 1: TCN with Multi-head Attention (TCNA) Model Architecture. The dashed future-time branch is an optional input for known-future (dynamic) covariates; it is not used in the experiments of this paper (see Section 7 ).
Scenario
Repair Type
Wafer Generation
A
No Repair
Sinusoidal
B
No Repair
Uniform
C
MTBF
Uniform
D
Processing Steps
Uniform
E
MTBF
Sinusoidal
F
Processing Steps
Sinusoidal
Table 1: Simulation Scenarios for Wafer Manufacturing
Figure 2: MAPE Values for an 8-Stage Cascade Semiconductor MiniFab Factory
Figure 3: TH Prediction Comparison for Medium Lot Size
Figure 4: TA Prediction Comparison for Medium Lot Size
Dataset
Scenario
Metrics
LSTM
TCN
TFT
TCNA
FEDformer
Autoformer
N-BEATS
Throughput
A
R2 Score
0.6754
0.9833
0.9998
0.9999
0.9984
0.9997
0.9990
MSE
1.22E-07
4.00E-08
5.67E-10
4.07E-10
5.22E-09
1.14E-09
3.32E-09
MAPE
32.59%
4.30%
0.54%
0.86%
3.28%
1.52%
1.90%
B
R2 Score
0.6810
0.9977
0.9998
0.9998
0.9983
0.9996
0.9989
MSE
1.20E-06
6.07E-09
5.77E-10
6.43E-10
5.22E-09
1.15E-09
3.35E-09
MAPE
32.56%
2.05%
0.57%
0.95%
3.36%
1.54%
1.98%
Table 2: Model Performance Comparison: Average Values for Scenarios A–F
Figure 5: TH Prediction Comparison for Small Lot Size
Figure 6: TH Prediction Comparison for Large Lot Size
Figure 7: TA Prediction Comparison for Small Lot Size
Figure 8: TA Prediction Comparison for Large Lot Size
Model Scores
Metrics
Lot Size
LSTM
TCN
TFT
TCNA
FEDformer
Autoformer
N-BEATS
t -statistic
Throughput
Small
3.37E+02
2.14E+02
1.84E+02
9.79E+01
1.02E+03
-2.08E+02
8.96E+01
Medium
-1.68E+03
1.59E+02
-2.12E+02
1.01E+01
8.02E+02
-1.51E+02
1.73E+02
Large
-4.07E+02
-1.20E+02
1.43E+02
1.76E+02
8.42E+02
-1.57E+02
1.22E+02
Turnaround Time
Small
1.12E+03
1.75E+03
-4.95E+02
5.04E+01
4.72E+02
-1.42E+02
4.15E+02
Medium
4.79E+02
-1.17E+00
2.96E+02
7.70E+01
4.42E+02
-1.32E+02
-1.79E+02
Table 3: Statistical Analysis for Scenario E
Timestamp
Lot Size
PDEVS Values
Percentage Difference from PDEVS Values
LSTM
TCN
TFT
TCNA
FEDformer
Autoformer
N-BEATS
Initial
Throughput
Small
1.14E-04
378.70%
31.71%
96.02%
94.38%
34.08%
155.16%
3.21%
Medium
1.10E-04
1931.99%
28.55%
87.50%
97.23%
32.03%
100.16%
23.99%
Large
1.12E-04
896.10%
12.20%
95.65%
92.52%
27.96%
107.36%
32.96%
Turnaround Time
Small
8.75E+03
13.28%
0.66%
3.47%
1.85%
28.10%
49.26%
20.54%
Medium
9.09E+03
8.06%
11.29%
0.92%
0.49%
28.05%
47.30%
16.87%
Table 4: Percentage Difference Between PDEVS and Model Predictions at Initial, Early-Horizon, and Final Time Steps for Throughput and Turnaround Time
Figure 9: TH Prediction Around the First Non-Zero Value for Medium Lot Size
Figure 10: TA Prediction Around the First Non-Zero Value for Medium Lot Size
Department of Data and Systems Engineering, The University of Hong Kong · The Research Center for Digital Production and Smart Logistics, Tsinghua University