Finding Optimal Cost-Bounded Plan Reductions: Refined Model

Authors: Martha Del ToroRaquel FuentetajaAngel García-Olaya

Organizations: Computer Science and Engineering Department, Universidad Carlos III de Madrid, Spain

Abstract

In some real applications a plan may later become unfeasible due to newly imposed budget constraints, yet, at the same time, using only the original actions of the plan and their order is mandatory. In this paper, we study the problem of extracting, from a precomputed plan, a valid subplan that maximizes utility while respecting a cost bound. Each goal is given a utility value and the plan is reduced by removing actions that support low-utility goals, while preserving both executability and the original action order. We show the decision variant is NP-complete and propose two exact methods to solve it: one via oversubscription planning (OSP) and another via Integer Linear Programming (ILP). This paper extends our previous work published at ICAPS 2026 (Del Toro, Fuentetaja, and García-Olaya 2026b). While the core framework remains as introduced there, we further introduce a refined ILP formulation that significantly decreases the model size and improves computational efficiency.

Explore similar work

Jun 9, 2026cs.AI

A complementary study on PlanGPT: Evaluation with defined Performance Metrics and comparison with a planner

Automated Planning is a subfield of Artificial Intelligence (AI) where the main objective is generating a sequence of actions, known as a plan, that helps us reach a goal state from an initial state. A planning problem is defined by a set of objects, an initial state and a desired goal state. The objective is to compute a plan that'll lead us from the inital state to the goal state. Programs that generate plans are called planners. In this paper, we did a complementary study to the state-of-the-art LLM called PlanGPT which was released last year. We redid some experiments to verify whether planning with LLMs is \textbf{pertinent} and \textbf{worthwhile}. We also check whether the results obtained in the official PlanGPT paper for plan coverage were correct, and we also performed a more comprehensive study on PlanGPT's performance: in our paper PlanGPT's performance was evaluated using two metrics: Plan Cost and Plan Generation Time. The results of planGPT were compared to those produced by a traditional planner for the same plans and same metrics. We discovered that PlanGPT is no better than a Greedy search strategy.
Youssef Abdelkader, Humbert Fiorino, Damien Pellier
Sep 3, 2026cs.AI

Lose the Order, Keep the Hierarchy: Deordering HTN Plans

Hierarchical Task Network (HTN) planning is a powerful planning formalism based on task decomposition. Although most of the literature studied plan generation, comparatively less attention has been paid to post-plan optimization. In particular, plan deordering has been extensively studied in classical planning but remains under-researched in the HTN setting. Plan deordering removes unnecessary ordering constraints between actions in a plan whilst keeping the plan valid. In this paper, we adapt two established plan deordering techniques from classical planning by extending the techniques to account for hierarchical decomposition constraints. We evaluate our proposed approaches on the IPC 2023 Partial-Order HTN benchmarks and we compare them against Optiplan, an HTN planner that generates partially ordered plans directly. Our results show a substantial reduction in number of ordering constraints in both our implementations. Although we also observe a reduction in critical path length, the improvements are less pronounced.
Takudzwa Togarepi, Gaspard Quenard, Damien Pellier +1
Sep 4, 2026cs.AI

Planning and Scheduling Business Processes under Control-Flow Uncertainty: Extended Version

Scheduling activities in business processes can improve efficiency (e.g., reduce makespan), but is challenging because the exact sequence of activities required to complete a case is often uncertain due to decisions based on data that emerges during execution. Nevertheless, probabilistic information regarding such decisions can often be estimated or derived from historical execution logs, and can help anticipate which execution paths are likely to lead to successful completion. Planning with particular execution paths affects feasibility, i.e., the probability of successful completion, and the expected number of superfluous activities that are planned but never executed. We frame the problem as a chance-constrained optimization problem and present two formulations: A decomposed approach with two stages, a planning stage that minimizes the expected number of superfluous activities subject to a feasibility constraint, and a scheduling stage that minimizes the makespan over the planned activities; and an integrated approach that combines planning and scheduling into a single formulation. Evaluation on two real-world and one synthetic dataset shows that the integrated approach yields superior makespans but is intractable at scale, while the decomposed approach scales to large settings.
Michel Kunkler, Stefanie Rinderle-Ma