Resource-Constrained Project Scheduling
Latest papers
10 papers0 papers in the last four weeks, against 1 the four weeks before. 0.0% of all new papers.
Dynamic multi-mode resource-constrained project scheduling requires decisions to be made under precedence constraints, limited resources, multiple execution modes, and uncertain activity durations. Genetic programming (GP) can automatically evolve heuristic rules for such problems, but its simulation-based fitness evaluation is computationally expensive. This study investigates phenotypic characterisation (PC) in surrogate-assisted GP to evolve higher-quality scheduling heuristics under a fixed budget of full simulation-based fitness evaluations. A key question is how GP individuals should be encoded into phenotypic characterisations to support effective fitness estimation. To answer this question, three PC encoding schemes with different levels of information richness are designed: priority-value encoding, which preserves raw rule outputs; rank encoding, which captures candidate ordering; and binary encoding, which represents final scheduling decisions. These encodings are combined with different distance metrics to measure behavioural similarity between GP individuals. The experimental results show that binary encoding with Euclidean distance provides the most effective and robust surrogate guidance. Further analyses show that surrogate estimation accuracy alone does not fully explain the performance differences. The PC representation also determines how effectively phenotypically redundant offspring are removed and how much behavioural diversity is retained after preselection. Ablation experiments further demonstrate that duplicate removal and surrogate preselection provide complementary benefits, with their combination producing the largest improvement. These findings highlight that effective surrogate-assisted GP depends not only on identifying promising offspring, but also on controlling redundancy and preserving useful diversity during evolutionary search.
SCHEDBench: A Benchmark for Evaluating LLM Constraint Faithfulness in Natural-Language Combinatorial Scheduling
This paper introduces SCHEDBench, a natural-language benchmark for evaluating combinatorial scheduling constraint faithfulness under surface-form variation. Grounded in canonical scheduling instances and solver-derived feasibility and optimality, SCHEDBench assesses whether large language models (LLMs) generate schedules with the same constraint-feasible behavior across varied natural-language (NL) surface forms. SCHEDBench spans 1,132 instances across job-shop scheduling problems (JSP), single and multi-mode resource-constrained project scheduling problems (RCPSP), nurse rostering/scheduling, and curriculum timetabling problems of varying difficulty. Instances are templated into natural language problems using domain-specific templates, themed entities, lexical-syntactic template rephrasing, and constraint-level surface-form variation, with reference solutions verified for feasibility and objective optimality. Across thirteen frontier and open-weight LLMs, we find that models are not reliably invariant to semantically equivalent renderings of the same scheduling problem. Surface-form variation reduces feasibility and induces above-noise shifts in per-instance hard-constraint violations on matched instances. Among the tested isolated axes, constraint reordering yields the clearest above-noise sensitivity.
Guiding Large Language Models with Genetic Programming-Evolved Heuristic Knowledge for Dynamic Multi-Mode Project Scheduling
In dynamic multi-mode project scheduling, activities have alternative execution modes and uncertain durations, while precedence relations and limited resources constrain their execution. Heuristic priority rules support fast online decisions, but their design requires substantial domain expertise. Genetic programming (GP) hyper-heuristics can automatically evolve such rules. Large language models (LLMs), meanwhile, provide a flexible interface for interpreting scheduling information and explaining decisions. However, zero-shot LLM decisions may lack domain knowledge, consume many tokens, and vary across repeated queries. GP-evolved rules therefore provide a potential source of scheduling knowledge for guiding LLM decisions. Unlike existing LLM--GP hybrids that use LLMs to support heuristic evolution, we transfer knowledge in the reverse direction, using knowledge extracted from high-quality GP rules to guide an online LLM decision maker. We extract knowledge from high-quality GP rules and inject it through Feature Selection, Feature Hint, Rule Reference, and Rule Follow. These mechanisms are evaluated in terms of scheduling performance, token consumption, decision stability, and the feature focus expressed in generated rationales. GP-derived guidance generally improves the unguided LLM, but its representation matters. Simplifying the decision context or supplying explicit decision logic is more effective than highlighting important features. Feature Selection offers the best token efficiency, whereas Rule Follow achieves strong performance at greater token cost. Guidance also improves decision stability and changes the features expressed in generated rationales.
Optimal Resource Utilization for Autonomous Laboratory Orchestrators
In autonomous laboratories, AI agents suggest the next batch of experiments to do. However, planning and executing those tasks taking full advantage of the available resources is a completely different question. This can be challenging when dealing with real-world hardware constraints, especially so when there are multiple instruments with different capacities and throughputs. Here we demonstrate a 2-step method to address resource utilization for our autonomous platform for metal-organic framework synthesis. First, we use constraint programming to find optimal schedules. This finds schedules that minimizes the total time while still satisfying the limitations and capacities of the hardware. Secondly, we use a system of status dependencies for each task, which allows for the robust execution of the optimal schedules.
Solving the Aircraft Disassembly Scheduling Problem
Dismantling aircrafts reaching their end of life is a complex endeavour that is necessary in terms of sustainability but yields small income margins for air transport companies. An efficient scheduling of the disassembly procedure is thus crucial to ensure the profitability of the process and incentivize practice. This is a large scheduling problem that involves thousands of tasks and many different constraints: Extracting parts that are destined to be reused requires technicians with specific certifications and equipment. Extraction operations might be subject to precedence relations. Furthermore, the aircraft must be kept balanced during the whole process. Finally, some of the locations of the aircraft have a limited space that caps the number of technicians able to work there concurrently. This article presents the problem in details and proposes two approaches to solve the problem: a Constraint Programming model and a MIP model. The models are tested on instances of varying sizes involving up to 1450 tasks, which are based on real operational data provided by an industrial partner.
Petri Net Induced Heuristic Search for Resource Constrained Scheduling
We formulate the Resource-Constrained Project Scheduling Problem (RCPSP) as optimal search over the reachability graph of a Timed Transition Petri Net with Resources, using relative-delay tokens so that scheduling decisions correspond to transition firings in the induced state space. We solve the resulting problem with guided by a heuristic that combines Critical Path and resource-based lower bounds, and prove that it is consistent under our token-based time semantics. Experiments on the PSPLIB benchmarks show that the approach outperforms strong exact Mixed-Integer Linear Programming (MIP) baselines (SCIP, CBC) in both success rate and solve time. Per-instance analysis shows that heuristic search and MIP degrade along independent axes, resource tightness for and formulation size for MIP, with resource strength mediating which solver benefits from scale.
Domain-Independent Dynamic Programming with Constraint Propagation
There are two prevalent model-based paradigms for combinatorial problems: 1) state-based representations, such as heuristic search, dynamic programming (DP), and decision diagrams, and 2) constraint and domain-based representations, such as constraint programming (CP), (mixed-)integer programming, and Boolean satisfiability. In this paper, we bridge the gap between the DP and CP paradigms by integrating constraint propagation into DP, enabling a DP solver to prune states and transitions using constraint propagation. To this end, we implement constraint propagation using a general-purpose CP solver in the Domain-Independent Dynamic Programming framework and evaluate using heuristic search on three combinatorial optimisation problems: Single Machine Scheduling with Time Windows, the Resource Constrained Project Scheduling Problem (RCPSP), and the Travelling Salesperson Problem with Time Windows (TSPTW). Our evaluation shows that constraint propagation significantly reduces the number of state expansions, causing our approach to solve more instances than a DP solver for Single Machine Scheduling and RCPSP, and showing similar improvements for tightly constrained TSPTW instances. The runtime performance indicates that the benefits of propagation outweigh the overhead for constrained instances, but that further work into reducing propagation overhead could improve performance further. Our work is a key step in understanding the value of constraint propagation in DP solvers, providing a model-based approach to integrating DP and CP.
Surrogate-Assisted Genetic Programming with Rank-Based Phenotypic Characterisation for Dynamic Multi-Mode Project Scheduling
The dynamic multi-mode resource-constrained project scheduling problem (DMRCPSP) is of practical importance, as it requires making real-time decisions under changing project states and resource availability. Genetic Programming (GP) has been shown to effectively evolve heuristic rules for such decision-making tasks; however, the evolutionary process typically relies on a large number of simulation-based fitness evaluations, resulting in high computational cost. Surrogate models offer a promising solution to reduce evaluation cost, but their application to GP requires problem-specific phenotypic characterisation (PC) schemes of heuristic rules. There is currently a lack of suitable PC schemes for GP applied to DMRCPSP. This paper proposes a rank-based PC scheme derived from heuristic-driven ordering of eligible activity-mode pairs and activity groups in decision situations. The resulting PC vectors enable a surrogate model to estimate the fitness of unevaluated GP individuals. Based on this scheme, a surrogate-assisted GP algorithm is developed. Experimental results demonstrate that the proposed surrogate-assisted GP can identify high-quality heuristic rules consistently earlier than the state-of-the-art GP approach for DMRCPSP, while introducing only marginal computational overhead. Further analyses demonstrate that the surrogate model provides useful guidance for offspring selection, leading to improved evolutionary efficiency.
On inferring cumulative constraints
Cumulative constraints are central in scheduling with constraint programming, yet propagation is typically performed per constraint, missing multi-resource interactions and causing severe slowdowns on some benchmarks. I present a preprocessing method for inferring additional cumulative constraints that capture such interactions without search-time probing. This approach interprets cumulative constraints as linear inequalities over occupancy vectors and generates valid inequalities by (i) discovering covers, the sets of tasks that cannot run in parallel, (ii) strengthening the cover inequalities for the discovered sets with lifting, and (iii) injecting the resulting constraints back into the scheduling problem instance. Experiments on standard RCPSP and RCPSP/max test suites show that these inferred constraints improve search performance and tighten objective bounds on favorable instances, while incurring little degradation on unfavorable ones. Additionally, these experiments discover 25 new lower bounds and five new best solutions; eight of the lower bounds are obtained directly from the inferred constraints.
Resource-constrained Project Scheduling with Time-of-Use Energy Tariffs and Machine States: A Logic-based Benders Decomposition Approach
In this paper, we investigate the Resource-Constrained Project Scheduling Problem (RCPSP) with Time-of-Use (TOU) energy tariffs and machine states, a variant of RCPSP for production scheduling, where energy price is part of the criteria and one highly energy-demanding machine can be in one of the following three states: proc, idle, or off. The problem involves scheduling all tasks, respecting precedence constraints and resource limitations, while minimizing the combination of the overall makespan and the Total Energy Cost (TEC), which varies according to the TOU tariffs, which can take negative values. We propose two novel approaches to solve it: a monolithic Constraint Programming (CP) approach and a Logic-Based Benders Decomposition (LBBD) approach. The latter combines a master problem handling the energy cost solved using Integer Linear Programming (ILP) with a subproblem handling the RCPSP, resolved using CP. Both approaches outperform the monolithic compact ILP counterpart, but the LBBD significantly outperforms the monolithic CP in most cases, especially when the makespan criterion is not included in the objective function, solving to optimality instances with up to 480 tasks. Finally, we propose a way to generalize our LBBD approach to other problems sharing similar characteristics, and applied it to various problems, such as an RCPSP with blocking times & total weighted tardiness criterion, or a flexible job shop.